Muis, Abdul (2020) Menentukan Rute Menara Transmisi 150kV Menggunakan Metode FAHP (Fuzzy Analytical Hierarchy Process) dari Gardu Induk PLTA Larona ke Gardu Induk PLTA Balambano di PT. Vale Indonesia Tbk. Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
02411850077041-Master_Thesis.pdf Download (4MB) | Preview |
Abstract
PT Vale Indonesia Indonesia, Tbk (PTVI), adalah perusahaan
pertambangan mineral yang memproduksi nikel sebagai produk utamanya. PTVI
membutuhkan keandalan pasokan daya yang tinggi dari pembangkit listrik tenaga
air (PLTA) ke pembangkit listrik thermal untuk di alirkan ke semua fasilitas
produksi sehingga dapat memproduksi nikel sesuai yang ditargetkan. Salah satu
peralatan penting untuk menjaga agar ketersediaan listrik dapat terpenuhi adalah
menara saluran transmisi. Kegagalan menara saluran transmisi akan memiliki efek
bencana pada operasi produksi nikel. PTVI akan kehilangan 165 MW jalur menara
saluran transmisi Larona gagal dan sisi lain akan kehilangan 200 MW jalur
transmisi menara Balambano gagal. Sehingga untuk mendukung ketersediaan
listrik secara terus menerus pembangunan menara saluran transmisi 150 KV jalur 5
(Line 5) dari gardu induk Larona ke gardu induk Balambano. Untuk menentukan
pembangunan jalur menara transmisi ini memiliki banyak pertimbangan yang harus
diperhatikan karena masing-masing jalur alternatif mempunyai kelebihan dan
kekurangan dari berbagai aspek. Metode yang akan digunakan untuk
menyelesaiakan permasalahan ini adalah metode FAHP (Fuzzy Analytical Hirercy
Process). Hasil nilai akhir pada setiap alternatif adalah 0.477 untuk North Route,
0.364 untuk Middle Route dan 0.159 untuk South Route. Berdasarkan hasil tersebut,
penulis merekomendasikan manajemen PT. Vale Indonesia, sebagai pemilik dan
operator pembangkit listrik tenaga air, memilih North Route untuk rencana
pembangunan menara transmisi 150kV.
======================================================================================================
PT Vale Indonesia Indonesia, Tbk (PTVI), is a mineral mining company
that produces nickel as its main product. PTVI requires high reliability of power
supply from hydroelectric power (PLTA) to thermal power plants to be distributed
to all production facilities so that it can produce nickel as targeted. One of the
important equipment to maintain electricity availability can be met is the
transmission line tower. Failure of the transmission line tower will have a disastrous
effect on nickel production operations. PTVI will lose 165 MW of the failed Larona
transmission line tower and the other side will lose 200 MW of the failed
Balambano tower transmission line. To support the continued availability of
electricity, the construction of a 150 KV transmission line tower line 5 from the
Larona switchyard to the Balambano switchyard. To determine the construction of
this transmission tower line has many considerations that must be considered
because each alternative path has advantages and disadvantages from various
aspects. The method that will be used to solve this problem is the FAHP (Fuzzy
Analytical Hirercy Process) method. The final value for each alternative is 0.477
for North Route, 0.364 for Middle Route and 0.159 for South Route. Based on these
results, the authors recommend the management of PT. Vale Indonesia, as the
owner and operator of the hydroelectric power plant, chose North Route for the
planned construction of the 150kV transmission tower.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Gardu induk Larona, Gardu induk Balambano, saluran transmisi menara 150kV, Fuzzy Analytical Hirercy Process. ==================================================================================================== Larona Switchyard, Balambano Switchyard, 150kV tower transmission line, Fuzzy Analytical Hirercy Process. |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis. T Technology > T Technology (General) > T58.62 Decision support systems |
Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26101-(S2) Master Thesis |
Depositing User: | Abdul Muis |
Date Deposited: | 20 Aug 2020 12:56 |
Last Modified: | 25 Nov 2023 13:38 |
URI: | http://repository.its.ac.id/id/eprint/79861 |
Actions (login required)
View Item |