Analisis Integrasi Jalur Tol Dengan Angkutan Penyeberangan Untuk Mendukung Konektivitas Antar Pulau

Abubakar, Rafly Syahriz (2021) Analisis Integrasi Jalur Tol Dengan Angkutan Penyeberangan Untuk Mendukung Konektivitas Antar Pulau. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04411640000023-Undergraduate_Thesis.pdf] Text
04411640000023-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2023.

Download (2MB) | Request a copy

Abstract

Program percepatan pembangunan infrastruktur yang dicanangkan pemerintah untuk meningkatkan perekonomian tertuang dalam Rencana Pembangunan Jangka Menengah Nasional (RPJMN) 2015-2019, yakni dengan menetapkan Proyek Prioritas dan Proyek Strategis Nasional. Dalam Proyek Prioritas dan Proyek Strategis Nasional, jalan tol merupakan salah satu proyek dimana terdapat proyek pembangunan tol Kalimantan Timur dengan rute Balikpapan-Samarinda dan Samarinda-Bontang didalamnya. Untuk proyek pembangunan tol Kalimantan Selatan telah tertuang dalam Rencana Strategis (RENSTRA) Dinas Pekerjaan Umum dan Penataan Ruang (PUPR) Pemerintah Provinsi Kalimantan Selatan. Dengan adanya proyek pembangunan jalan tol di Kalimantan dikhawatirkan volume kendaraan yang melintasi tol tersebut akan kecil. Oleh karena itu, Tugas Akhir ini bertujuan untuk mengintegrasikan jalur tol dengan angkutan penyeberangan agar dapat meningkatkan volume kendaraan yang melintasi jalur tol baru tersebut. Berdasarkan hasil analisis biaya, diperoleh biaya unit minimum untuk skenario 1 (rute tanpa tol) sebesar Rp 62.807 per ton, skenario 2 (rute melalui tol) sebesar Rp 61.797 per ton, skenario 3 (menggunakan kapal roro) sebesar Rp 53.573 per ton, dan skenario 4 (menggunakan kapal peti kemas) sebesar Rp 443.000. Opportunity cost yang didapatkan dari selisih waktu transportasi dari skenario 1 dan skenario 2 sebesar Rp. 672.575. Sedangkan untuk durasi pengiriman tercepat adalah skenario 2 selama 51,91 jam.
======================================================================================================
The infrastructure development acceleration program launched by the government to improve the economy is contained in the 2015-2019 National Medium-Term Development Plan (RPJMN), namely by establishing Priority Projects and National Strategic Projects. In Priority Projects and National Strategic Projects, the toll road is one of the projects in which there is an East Kalimantan toll road construction project with the Balikpapan-Samarinda and Samarinda-Bontang routes in it. The South Kalimantan toll road construction project has been stated in the Strategic Plan (RENSTRA) of the Public Works and Spatial Planning (PUPR) of the South Kalimantan Provincial Government. With the toll road construction project in Kalimantan, it is feared that the volume of vehicles crossing the toll road will be small. Therefore, this final project aims to integrate toll lanes with ferry transportation in order to increase the volume of vehicles crossing the new toll lane. Based on the results of the cost analysis, the minimum unit cost for scenario 1 (route without toll) is IDR 59.90 per ton, scenario 2 (route via toll road) is IDR 53,463 per ton scenario 3 (using roro ship) is IDR. 53,573 per ton, and scenario 4 (using container ship) is IDR. 443,000. The opportunity cost obtained from the difference in transportation time from scenario 1 and scenario 2 is IDR. 672,575. Meanwhile, the fastest delivery duration is scenario 2 for 51.91 hours.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Integrasi, Unit Cost, Jalur tol, Angkutan Penyeberangan, Integration, Unit Cost, Toll Roads, Ferriage Transport
Subjects: H Social Sciences > HE Transportation and Communications > HE336.C5 Choice of transportation
T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Marine Technology (MARTECH) > Marine Transportation Engineering > 21207-(S1) Undergraduate Thesis
Depositing User: Rafly Syahriz Abubakar
Date Deposited: 03 Mar 2021 06:20
Last Modified: 03 Mar 2021 06:20
URI: http://repository.its.ac.id/id/eprint/83290

Actions (login required)

View Item View Item