Perhitungan Waktu dan Biaya Proyek Pembangunan Attic Showroom Dharmahusada Surabaya Menggunakan Metode Half Slab

Purnama, Tiara Dhian (2021) Perhitungan Waktu dan Biaya Proyek Pembangunan Attic Showroom Dharmahusada Surabaya Menggunakan Metode Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910015034-Undergraduate_Thesis.pdf] Text
10111910015034-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (26MB) | Request a copy

Abstract

Bangunan yang dijadikan lokasi studi dalam penulisan proyek akhir berjudul “Perhitungan Waktu dan Biaya Proyek Pembangunan Attic Showroom Dharmahusada Surabaya Menggunakan Metode Half Slab” adalah Gedung Attic Showroom Dharmahusada yang berada di Jalan Dharmahusada No. 152, Kelurahan Mojo, Kecamatan Gubeng, Surabaya. Gedung ini dibangun oleh P.T. Nusa Raya Cipta Tbk. Gedung setinggi 13 lantai ini memiliki total luas ± 576 m² dengan beton bertulang sebagai material utama. Dalam proyek akhir ini, lantai yang ditinjau adalah lantai dasar sampai lantai 12.
Untuk struktur yang ditinjau dalam proyek akhir ini adalah struktur bawah dan atas. Struktur bawah terdiri dari pondasi bore pile, pile cap, dan tie beam. Sedangkan untuk struktur atas antara lain kolom, balok, pelat dan tangga. Seluruh pekerjaan beton dilakukan menggunakan metode cast in-situ. Namun untuk pelat, akan diperhitungkan kembali menggunakan metode half slab precast. Dalam perhitungan waktu, dihitung berdasarkan volume pekerjaan, produktivitas, durasi pekerjaan dan kebutuhan sumber daya tiap item pekerjaan. Sedangkan untuk perhitungan biaya meliputi harga material, upah pekerja dan harga alat yang dibutuhkan. Harga yang digunakan adalah harga survey lapangan di Kota Surabaya. Untuk penjadwalan item pekerjaan dilakukan menggunakan software Microsoft Project. Hasil akhir dari proyek akhir ini adalah rekapitulasi perhitungan waktu dan biaya pelaksanaan dan kurva S Gedung Attic Showroom Dharmahusada Surabaya.
Berdasarkan hasil analisa, didapatkan durasi 220 hari kerja dengan biaya pelaksanaan sebesar Rp 15.674.312.376,51.

======================================================================================================

The building which is used as the location’s study of the final project entitled "Time and Cost Calculation of The Construction of Attic Showroom Building Dharmahusada Surabaya Using Half Slab Method" is the Dharmahusada Attic Showroom Building located at Jalan Dharmahusada No. 152, Kelurahan Mojo, Kecamatan Gubeng, Surabaya. This building was built by P.T. Nusa Raya Cipta Tbk. This 13 story building have a total area of ± 576 m² with reinforced concrete as the main material. In this final project, the floor being reviewed is the ground floor to the 12th floor.
The structures that are reviewed in this final project are the lower and upper structures. The lower structure consists of bore pile foundation, pile cap, and tie beam. Meanwhile, the upper structures include columns, beams, plates and stairs. All concrete works were carried out using the cast in-situ method. However, for plates, it will be recalculated using the half slab precast method. In the calculation of time, it is calculated based on the volume of work, productivity, duration of work and resource requirements of each work item. Meanwhile, the cost calculation includes the price of materials, wages of workers and the price of the equipment needed. Current price is the price of the field survey in the city of Surabaya. Schedulling of work items is done using Microsoft Project software. The final result of this final project is a recapitulation of time and cost calculation and S curve of Attic Showroom Building Dharmahusada Surabaya.
Based on the results of the analysis, the duration of work for 220 working days was obtained with an implementation cost of Rp 15.674.312.376,51.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Waktu dan biaya pelaksanaan, metode half slab precast, kurva S, Time and cost of implementation, half slab precast method, S curve
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Tiara Dhian Purnama
Date Deposited: 08 Mar 2021 02:12
Last Modified: 08 Mar 2021 02:12
URI: http://repository.its.ac.id/id/eprint/83733

Actions (login required)

View Item View Item