Perencanaan Proyek Investasi Pltu Jawa 9 Dan 10 Dengan Pendekatan Balanced Scorecard Dan Multi Criteria Decision Making

Kurniawan, Yulius Indhra (2021) Perencanaan Proyek Investasi Pltu Jawa 9 Dan 10 Dengan Pendekatan Balanced Scorecard Dan Multi Criteria Decision Making. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211850026019-Master_Thesis.pdf] Text
09211850026019-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

PT. Indonesia Power adalah salah satu anak perusahaan PT. PLN (Persero) yang bergerak di bidang pembangkitan dan pemeliharaan pembangkit listrik. Untuk mempertahankan porsi pembangkitan listrik di Indonesia maka PT. Indonesia Power melebarkan bisnisnya dengan bergerak di bidang pengembangan pembangkit listrik. Pembangunan PLTU Jawa 9 dan 10 dengan kapasitas 2 1000 MW adalah salah satu progam PT. Indonesia Power dalam mengembangkan pembangkit yang sesuai dengan Proyek Strategis Nasional menggunakan teknologi terbaru yang lebih effesien dan ramah lingkungan.

Investasi pembangkit listrik dengan kapasitas 2 1000 MW merupakan investasi keuangan dalam skala besar. Dalam melakukan proyek tersebut, PT. Indonesia Power membutuhkan kerja sama dengan lembaga keuangan untuk mendanai proyek yang membutuhkan dana besar dengan waktu pengembalian yang lama. Pemilihan lembaga keuangan yang tepat menjadi hal yang krusial karena mempengaruhi keberhasilan proyek secara langsung.

Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor yang mendasari suatu lembaga keuangan dalam memberikan pendanaan bagi proyek pembangunan PLTU Jawa 9 dan 10. Faktor-faktor ini dielaborasi menggunakan pendekatan Balanced Scorecard dengan empat dimensi dan delapan kriteria. Multi Criteria Decision Making. Untuk menentukan ranking dan kausalitas dari faktor-faktor yang diperoleh dalam Balanced Scorecard, maka dilakukan pembobotan pada seluruh dimensi dan kriteria dengan menggunakan Interval Type 2 (IT2) Fuzzy DEMATEL. Selain itu, penggunaan Fuzzy QUALIFLEX dapat memberikan keputusan bagi PT. Indonesia Power untuk memilih lembaga keuangan yang sesuai untuk pendanaan proyek pembangunan PLTU Jawa 9 dan 10.

Dalam penelitian ini ditemukan bahwa besar biaya investasi dan waktu pengembalian investasi menjadi pertimbangan utama bagi suatu lembaga keuangan dalam mengambil keputusan untuk melakukan pendanaan pembangunan Proyek PLTU Jawa 9 dan 10. Selain itu penelitian ini menemukan bahwa lembaga keuangan asing (ECA) merupakan lembaga yang paling tepat dalam melakukan pendanaan.
==========================================================

PT. Indonesia Power is a subsidiary of PT. PLN (Persero) which is engaged in the generation and maintenance of power plants. To maintain the portion of electricity generation in Indonesia, PT. Indonesia Power is expanding its business by engaging in power plant development. The construction of PLTU Jawa 9 & 10 with a capacity of 2 1000 MW is one of PT. Indonesia Power in developing power plants in accordance with the National Strategic Project uses the latest technology that is more efficient and environmentally friendly.

Investment in power plants with a capacity of 2 1000 MW is a large scale financial investment. In carrying out the project, PT. Indonesia Power requires cooperation with financial institutions to fund projects that require large funds with long payback periods. Choosing the right financial institution is crucial because it directly affects the success of the project.

The purpose of this study is to determine the factors that underlie a financial institution in providing funding for the Java 9 & 10 PLTU development project. These factors are elaborated using the Balanced Scorecard approach with four dimensions and eight criteria. Multi Criteria Decision Making. To determine the ranking and causality of the factors obtained in the Balanced Scorecard, weighting is carried out on all dimensions and criteria using Interval Type 2 (IT2) Fuzzy DEMATEL. In addition, the use of Fuzzy QUALIFLEX can provide a decision for PT. Indonesia Power to select the appropriate financial institution for funding the Java 9 & 10 PLTU construction project.

In this study it was found that the amount of investment costs and the time of return on investment were the main considerations for a financial institution in making decisions to fund the construction of the Java 9 & 10 PLTU Project. In addition, this study finds that foreign financial institutions (ECAs) are the most appropriate institutions for funding.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Balanced Scorecard, investasi proyek, Multi Criteria Decision Making, pembangkit listrik. ========================================================== Balanced Scorecard, investasi proyek, Multi Criteria Decision Making, pembangkit listrik
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T58.62 Decision support systems
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis
Depositing User: Yulius Indhra Kurniawan
Date Deposited: 08 Mar 2021 09:52
Last Modified: 08 Mar 2021 09:52
URI: http://repository.its.ac.id/id/eprint/83846

Actions (login required)

View Item View Item