Perhitungan Waktu Dan Biaya Pelaksanaan Proyek Rumah Sakit Permata Keluarga Karawang

Kusuma, Yohanes Bagaskara Cahya (2021) Perhitungan Waktu Dan Biaya Pelaksanaan Proyek Rumah Sakit Permata Keluarga Karawang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111610013057-Undergraduate_Thesis.pdf] Text
10111610013057-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (20MB) | Request a copy

Abstract

Penyusunan proyek akhir yang berjudul “Perhitungan
Waktu dan Biaya Pelaksanaan Proyek Rumah Sakit Permata
Keluarga Karawang” ini menggunakan Proyek Rumah Sakit
Permata Keluarga yang berlokasi di Karawang, Jawa Barat
yang terdiri dari lantai 1 sampai lantai 9.Proyek ini dibangun oleh PT. Pulauintan Bajaperkasa Konstruksi selaku Kontraktor utama.
Data yang diperoleh pada proyek ini adalah gambar
struktur dan RAB.Proyek akhir ini meninjau pekerjaan struktur bawah yang terdiri dari pekerjaan pemancangan, pilecap, tie beam dan pelat basement serta pekerjaan struktur atas yang terdiri dari pekerjaan kolom, shearwall, balok , tangga dan pelat. Perhitungan waktu dan biaya pada proyek ini ditentukan
dengan menghitung volume pekerjaan, produktivitas, durasi , kebutuhan sumber daya tiap item pekerjaan dan harga tiap item pekerjaan yang meliputi harga material, sewa alat dan upah pekerja.
Hasil akhir dari proyek akhir ini adalah network
planning dan kurva S. Total durasi pekerjaan selama 248 hari
kerja dan biaya pekerjaan sebesar Rp. 39,724,567,355.-
===================================================================================================

This final project, “Project Schedule and Budget Estimation of Permata Keluarga Hospital Karawang” located in Karawang, West Java which consists of floors 1 to 9. This project was built by PT. Pulauintan Bajaperkasa Konstruksi as the main contractor.
The data obtained in this project are structural drawings and budget plan. This final project examines the lower structure work consisting of piling, pilecap, tie beam and basement slab as well as upper structural work consisting of column work, shearwall, beams, stairs and slabs. The calculation of time and costs in this project is determined by calculating the volume of work, productivity, duration, resource requirements of each work item and the price of each work item which includes material prices, equipment rental and worker wages.
The final result of this final project is network planning and S curve. The total duration of work is 248 working days and the work cost is Rp. 39,724,567,355.-

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: implementation duration and cost, implementation budget plan, network planning, S curve, durasi dan biaya pelaksanaan, rencana anggaran pelaksanaan, kurva S
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Yohanes Bagaskara Cahya Kusuma
Date Deposited: 09 Mar 2021 06:47
Last Modified: 09 Mar 2021 06:47
URI: http://repository.its.ac.id/id/eprint/83870

Actions (login required)

View Item View Item