Perencanaan Sel Tempat Pembuangan Akhir (TPA) Dengan Sistem Controlled Landfill Pada TPA Lubuk Binjai - Lubuklinggau

Pamungkas, Rendy Cahya Putra (2021) Perencanaan Sel Tempat Pembuangan Akhir (TPA) Dengan Sistem Controlled Landfill Pada TPA Lubuk Binjai - Lubuklinggau. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111740000034-Undergraduate_Thesis.pdf] Text
03111740000034-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (7MB) | Request a copy

Abstract

Kota Lubuklinggau merupakan salah satu daerah administratif tingkat II di daerah administratif tingkat I/Provinsi Sumatera Selatan. Kepadatan penduduk di kota Lubuklinggau adalah sekitar 578 jiwa/km² dengan peningkatan penduduknya yaitu rata rata 3000 jiwa tiap tahunnya memberikan pengaruh terhadap berbagai sektor yang berhubungan dengan pemenuhan kebutuhan masyarakat, salah satunya adalah infrastruktur persampahan. TPA Petanang yang merupakan tempat penampungan sampah di wilayah Kota Lubuklinggau telah mencapai kapasitas maksimumnya. Dibutuhkanlah TPA baru yang mampu menggantikan perannya. TPA Lubuk Binjai menjadi solusi bagi pemerintah setempat untuk menampung sampah yang ada dengan sistem controlled landfill yang lebih ramah lingkungan. Adanya Sel E yang telah beroperasi secara controlled landfill memacu pemerintah untuk melakukan pembangunan sel C dan D untuk menambah fasilitas penampungan sampah. Persiapan pembangunan itu tentunya harus direncanakan secara baik dan harus sesuai peraturan yang ada pada Peraturan Menteri Pekerjaan Umum No 3 tahun 2013.
Dari permasalahan tersebut, maka diperlukan perencanaan pembangunan masing – masing sel C dan D. Dalam tugas akhir ini dilakukan beberapa perencanaan diantaranya perencanaan tanggul dari timbunan tanah yang dipadatkan meliputi dimensi tanggul dengan perkuatan menggunakan geotextile, analisa stabilitas timbunan sampah dengan perkuatan cerucuk. Kondisi eksisting pada masing – masing sel harus sesuai persyaratan dalam penentuan lokasi sel TPA menurut peraturan yang telah ditetapkan.
Dari hasil analisa kondisi eksisting sel C dan D dibandingkan dengan Peraturan Menteri Pekerjaan Umum No 3 Tahun 2013, ada beberapa persyaratan yang telah memenuhi dan ada pula persyaratan yang tidak memenuhi. Hal itu bisa dijadikan pertimbangan dalam pembangunan TPA. Kemudian hasil analisa tanggul untuk sel D memiliki variasi ketinggian menyesuaikan elevasi dasar sampah dengan tinggi terendah 3 m hingga tertingginya 6.7m. Untuk perencanaan sel C tanggul dibuat setinggi 6m dengan meratakan elevasi dasar sampah menjadi satu elevasi yang sama. Perkuatan geotextile dan cerucuk setiap sel mengikuti kebutuhan masing masing tanggul sesuai analisa yang didapatkan.
Timbunan sampah sel C dan D direncanakan setinggi 15m dan terbagi menjadi 3 lift. Perencanaan sel D memiliki variasi ketinggian lift sampah, sedangka untuk sel C memiliki tinggi lift sampah yang seragam yaitu sebesar 5m. Perkuatan geotextile dan cerucuk setiap sel mengikuti kebutuhan masing masing timbunan sampah sesuai analisa yang didapatkan.
======================================================================================================
Lubuklinggau City is one of the second-level administrative areas in the I/South Sumatra Province administrative area. The population density in the city of Lubuklinggau is around 578 people/km² with an increase in population, which is an average of 3000 people per year, which has an influence on various sectors related to meeting community needs, one of which is solid waste infrastructure. The Petanang’s municipal solid waste disposal which is a waste collection site in the Lubuklinggau City area has reached its maximum capacity. A new TPA is needed that can replace its role. Lubuk Binjai’s municipal solid waste disposal is a solution for the local government to accommodate existing waste with a controlled landfill system that is more environmentally friendly. The existence of Cell E which has been operating in a controlled landfill has spurred the government to carry out the construction of cells C and D to add waste storage facilities. The preparation for the development must of course be well planned and must comply with the existing regulations in Ministerial Regulation No. 3 of 2013.
From these problems, it is necessary to plan the development of each cell C and D. In this final project, several plans have been carried out including planning for embankments from compacted soil embankments including dimensions of embankments with reinforcement using geotextiles, and stability analysis of waste piles with rebar reinforcement. Existing conditions in each cell must comply with the requirements in determining the location of landfill cells according to established regulations.
From the results of the analysis of the existing conditions of cells C and D compared to the Regulation of the Minister of Public Works No. 3 of 2013, there are several requirements that have been met and some are not. This can be taken into consideration in the construction of a landfill. Then the results of the embankment analysis for cell D have variations in height according to the elevation of the base of the waste with the lowest height of 3 m to the highest of 6.7 m. For the planning of cell C, the embankment is made as high as 6m by leveling the elevation of the base of the waste into the same elevation. Reinforcement of geotextiles and cones for each cell follows the needs of each embankment according to the analysis obtained.
The waste piles for cells C and D are planned to be 15m high and divided into 3 lifts. The planning for cell D has variations in the height of the garbage lift, while for cell C it has a uniform height of the garbage lift, which is 5m. Reinforcement of geotextiles and cones for each cell follows the needs of each waste pile according to the analysis obtained.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: tempat pembuanga akhir, Lubuk Binjai, controlled landfill, ppen dumping, sel sampah, final disposal site, Lubuk Binjai, controlled landfill, open dumping, garbage cell
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization
T Technology > TD Environmental technology. Sanitary engineering > TD795.7 Sanitary landfills. Leachate--Purification.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Rendy Cahya Putra Pamungkas
Date Deposited: 01 Aug 2021 06:15
Last Modified: 01 Aug 2021 06:15
URI: http://repository.its.ac.id/id/eprint/84654

Actions (login required)

View Item View Item