Metode Pelaksanaan Serta Perhitungan Waktu Dan Biaya Pada Proyek Hotel Ibis Budget Surabaya Dengan Menggunakan Aluminium Formwork

Raharja, Nirwan Zulmar (2021) Metode Pelaksanaan Serta Perhitungan Waktu Dan Biaya Pada Proyek Hotel Ibis Budget Surabaya Dengan Menggunakan Aluminium Formwork. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010074-Undergraduate_Thesis.pdf]
Preview
Text
10111710010074-Undergraduate_Thesis.pdf - Accepted Version

Download (7MB) | Preview

Abstract

Proyek pembangunan Hotel Ibis Budget Surabaya ini
berlokasi di Jalan Mayjen HR Muhammad 24 Suko Manunggal,
Putat Gede, Sukomanunggal, Surabaya, Jawa Timur, Indonesia.
Proyek ini dibangun dengan luas bangunan ± 1.162,0932 m2
dengan total 17 lantai yang terdiri dari 1 lantai basement dan 16
lantai hunian. Dalam pembangunannya, proyek ini menggunakan
struktur beton bertulang. Tulangan yang digunakan difabrikasi di
lokasi proyek. Secara keseluruhan sistem struktur gedung ini
memiliki bentang yang cukup lebar. Proyek akhir ini akan
melakukan perencanaan pelaksanaan pekerjaan struktur dengan
objek pembangunan Hotel Ibis Budget Surabaya dari lantai satu
hingga lantai sembilan, sampai mendapat hasil akhir berupa waktu
dan biaya sesuai dengan metode yang direncanakan. Penjadwalan
proyek sangatlah penting sebagai alat tolak ukur apakah proyek
tersebut dapat selesai sesuai dengan waktu yang telah
direncanakan atau lebih dari waktu yang direncanakan.
Perhitungan waktu dan biaya menggunakan sumber
referensi utama dari Ir. A. Soedrajat s, Analisa (cara modern)
Anggaran Biaya Pelaksanaan Penerbit “Nova” Bandung dan
referensi tentang alat berat. Data yang diperoleh dari proyek ini
adalah gambar struktur dan arsitektur. Data diolah untuk dijadikananalisa bentuk, ukuran dan volume. Sedangkan untuk
produktivitas dan kebutuhan sumber daya setiap pekerjaan
dihitung berdasarkan referensi yang digunakan. Dari hasil
pengolahan data, maka didapatkan perhitungan waktu pelaksanaan
dan rencana anggaran biaya yang diperlukan dari pelaksanaan
pembangunan pada obyek studi. Pada perhitungan rencana
anggaran biaya bekisting yang digunakan yaitu aluminium
formwork.
Untuk hasil durasi dan produktivitas tiap pekerjaan
digunakan sebagai penjadwalan yang dapat dilakukan dengan
membuat Network Planning dan Kurva S. Adapun alat bantu yang
digunakan dalam menyusun penjadwalan proyek beserta dengan
metode pelaksanaannya dapat dilakukan dengan menggunakan
program Microsoft Project 2013. Dari perencanaan yang telah
disusun didapatkan hasil durasi pelaksanaan proyek tersebut
adalah 132 hari dengan total biaya sebesar Rp 4.299.580.849.
==================================================================================================
The Ibis Budget Surabaya Hotel construction project is
located at Jalan Mayjen HR Muhammad 24 Suko Manunggal,
Putat Gede, Sukamanunggal, Surabaya, East Java, Indonesia. The
project was built with a building area of ± 1162.0932 m2 with a
total of 17 floors consisting of one floor basement and 16
residential floors. In its construction, this project uses a reinforced
concrete structure. The reinforcement used is fabricated at the
project site. The overall structural system of this building has a
fairly wide span. This final project will plan the implementation of
structural work with the object of the construction of the Ibis
Budget Surabaya Hotel from the first floor to the ninth floor, until
it gets the final result in the form of time and cost according to the
planned method. Project scheduling is very important as a
benchmark whether the project can be completed in accordance
with the planned time or more than the planned time.
Calculation of time and cost using the main reference
source from Ir. A. Soedrajat s, Analysis (modern way) Budget
Implementation Cost of Publisher "Nova" Bandung and references
about heavy equipment. The data obtained from this project are
structural and architectural drawings. The data is processed for
analysis of shape, size and volume. As for the productivity and resource requirements of each job, it is calculated based on the
reference used. From the results of data processing, it is obtained
the calculation of the implementation time and the required budget
plan for the implementation of development on the object of study.
In calculating the budget plan, the formwork used is aluminum
formwork.
For the results of the duration and productivity of each job,
it is used as a schedule that can be done by making Network
Planning and S Curves. The tools used in preparing project
scheduling along with the implementation method can be done
using the program. Microsoft Project 2013the duration of the
project implementation is 132 days with a total cost of Rp
4.299.580.849.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: aluminum formwork, implementation time, implementation cost budget, network planning, S-Curve aluminium formwork, waktu pelaksanaan, rencana anggaran biaya, network planning, Kurva S
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA480.A6 Aluminum alloys.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Nirwan Zulmar Raharja
Date Deposited: 01 Sep 2021 14:35
Last Modified: 04 Jul 2024 07:03
URI: http://repository.its.ac.id/id/eprint/91449

Actions (login required)

View Item View Item