Rajasa, Axell Atalla and Sunarnjoto, Krisna Vienno (2022) Laporan Kerja Praktek Proyek Pembangunan Jalan Bebas Hambatan Cisumdawu Phase III PT. Adhi Karya (Persero) Tbk. Project Report. [s.n], [s.l.]. (Unpublished)
Text
03111840000154_03111840000153-Jalan Bebas Hambatan Cisumdawu Phase III_Report.pdf - Accepted Version Restricted to Repository staff only Download (18MB) | Request a copy |
Abstract
Jalan tol adalah jalan bebas dari hambatan bertujuan untuk mempersingkat jarak dan waktu tempuh dari suatu tempat ke tempat lain. Pembangunan jalan tol diharapkan dapat mengatasi permasalahan dan meningkatkan perekonomian warga sekitar. Pemerintah melalui Kementrian Pekerjaan Umum dan Perumahan Rakyat menunjuk China Road and Bridge Corporation sebagai perusahaan asing dan PT. Adhi Karya (Persero) Tbk. sebagai BUMN membentuk perusahaan gabungan dalam lingkup Join Opersai (JO), dalam mereaslisasikan pekerjaan Pembangunan Jalan Bebas Hambatan Cisumdawu Phase III. Pada proyek ini dimulai dengan kegiatan pekerjaan pembersihan lahan (land clearing) kemudian dilanjutkan dengan pekerjaan galian tanah dan timbunan tanah (cut & fill) selanjutnya pekerjaan lapisan pondasi atas, lean concrete dan rigid pavement) Pekerjaan dilapangan dengan menggunakan alat berat yaitu, Excavato, Bulldozer, Motor Grader, Vibroratory Roller, Wirtgen SP 500, Dump Truck, Truck Mixer digunakan dalam pekerjaan galian dan timbunan, penghamparan dan pemadatan Lapis Pondasi Atas, pengecoran Beton, mengangkut material dalam pelaksanaan Main Road.
================================================================================================
Toll road is a freeway from obstacles aimed at shortening the distance and travel time from one place to another. The construction of toll roads is expected to be able to overcome problems and improve the economy of local residents. The government through the Ministry of Public Works and Public Housing appointed China Road and Bridge Corporation as a foreign company and PT. Adhi Karya (Persero) Tbk. as a BUMN formed a joint company within the scope of the Join Operation (JO), in realizing the construction work of the Cisumdawu Highway Phase III. In this project, it begins with land clearing work, then continues with excavation work and soil piles (cut & fill) then top foundation layer work, lean concrete and rigid pavement) Field work using heavy equipment, namely, Excavato, Bulldozer , Motor Grader, Vibroratory Roller, Wirtgen SP 500, Dump Truck, Truck Mixer are used in excavation and embankment work, laying and compaction of Top Layer, Concrete casting, transporting material in Main Road construction.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Pelaksanaan Perbaikan Tanah Dasar, Lapisan Pondasi Atas, Lean Concrete dan Rigid Pavement, Cisumdawu. |
Subjects: | H Social Sciences > HE Transportation and Communications > HE355.4 Toll roads T Technology > TA Engineering (General). Civil engineering (General) T Technology > TA Engineering (General). Civil engineering (General) > TA780.C29 Piling (Civil engineering) |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Krisna Vienno Sunarnjoto |
Date Deposited: | 17 Jan 2022 04:56 |
Last Modified: | 28 Apr 2022 06:30 |
URI: | http://repository.its.ac.id/id/eprint/92313 |
Actions (login required)
View Item |