Perancangan Tiang Pancang Gedung PT. Trijaya Kartika Yang Telah Dimodifikasi Dengan Perhatian Khusus Efisiensi Lateral Yang Dihitung Menggunakan Metode Elastis Akibat Beban Lateral

Kesumaratih, Rr. Denok Dwi (2009) Perancangan Tiang Pancang Gedung PT. Trijaya Kartika Yang Telah Dimodifikasi Dengan Perhatian Khusus Efisiensi Lateral Yang Dihitung Menggunakan Metode Elastis Akibat Beban Lateral. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3107100552-Undergraduate_Thesis.pdf] Text
3107100552-Undergraduate_Thesis.pdf

Download (13MB)

Abstract

Pondasi merupakan struktur bawah yang berfungsi menyalurkan seluruh beban yang bekerja pada struktur atas menuju tanah yang mendukung konstruksi tersebut. Dalam perancangan pondasi harus diperhatikan dengan seksama bebanbeban yang bekerja yaitu baik beban gravitasi maupun beban lateral karena struktur bawah tidak boleh gagal lebih dahulu daripada struktur atas. Struktur bawah harus berperilaku elastis penuh tidak tergantung pada tingkat daktilitas struktur atasnya. Di dalam tugas akhir ini akan membahas tentang perancangan pondasi tiang pancang gedung PT.Trijaya Kartika Surabaya dengan perhatian khusus efisiensi lateral yang dihitung dengan menggunakan metode elastis akibat beban lateral. Selain menggunakan Metode elastis untuk efisiensi Lateral tiang pancang ini juga dianalisa menggunakan BMS (Bridge Management System ). Metode elastis mengasumsikan bahwa tanah mempunyai elemen -elemen yang terpisah , pada saat tiang diberi beban tiang akan mengalami defleksi sedangkan kekuatan tanah konstan . Perhitungan struktur gedung trijaya Kartika surabaya dimaksudkan untuk mendapatkan gaya dalamnya yang kemudian dianalisa sehingga diperoleh yaitu : jumlah tiang pancang yang dibutuhkan, efisiensi lateral dari modulus konstanta tanah dasar ( nh ), efisiensi lateral dari perhitungan beban lateral disesuaikan dengan jarak antar tiang pancang. Dari perhitungan yang dilakukan didapatkan yaitu dengan panjang tiang pancang = 15,8 m diameter tiang pancang = 0,5 m dibutuhkan 9 buah tiang pancang dengan efisiensi lateral dari nh = 29,91 %. Selain itu perhitungan efisiensinya juga dicoba dengan beberapa jarak antar tiang pancang yaitu 3 D, 4 D dan 5D dalam 1 pilecap didapatkan efisiensi yang beragam. Demikian juga untuk keseluruhan bangunan yang ditinjau, dengan S = 3D efisiensinya 31%. Efisiensi Lateral juga didapatkan dari BMS yaitu untuk S = 3D efisiensinya 12,5% Menurut Prakash untuk jarak searah beban 3D dan jarak tegak lurus beban minimal 2,5D maka efisiensinya 25% sedangkan jarak 8D efisiensinya 100% hal ini tanpa memperhatikan jenis tanah sebagai pendukungnya. Sehingga dapat ditarik kesimpulan bahwa tiang pancang dengan S = 3D efisiensinya antara 25% - 30%
============================================================================================================================
Foundation is the under of structure which had function for distribution all load at the top of structure to the ground that supporting the construction. In foundation scheme have to be paid attention to careful the load which working eventhough gravitation load and also lateral load because the structure may not fail in advance than up structure. The under Structure had to be full elastic it is not depends on level ductility of the top structure In this final duty will study about the pile foundation scheme PT. Trijaya Kartika Surabaya building which have been modificated with special attention in lateral efficiency that calculated by elastic method cause the effect of lateral load. Besides using elastic Method for the efficiency of this Lateral piling also analysed using the BMS ( Bridge of Management System). Elastic method assume that land have the separate element, at the time of pillar given by the pillar load will experience of the defleksi while constant strength land. Calculation of Structure of PT. Trijaya Kartika Surabaya building intended to get the analysed later depth style, is so that obtained that arc : sum u p the required piling, lateral efficiency from base land ( nil), lateral efficiency from calculation of lateral load adapted by a distance usher the piling. From the calculation will get result, with length the pile = 15,8 in diameter of piling = 0,5 m required 9 pile’s with the efficiency lateral from nh = 29,91 %. Others its efficiency calculation is also tried with a few apart to usher the piling that is 3D, 4 D and 5D in 1 pileeap they got a immeasurable efficiency. And the overall of evaluated building, with S = efficiency 31%. Efficiency Lateral is also got from BMS that is for the S - 3D efficiency 12,5%. According to Prakash for the distance of unidirectional of burden 3D and vertical distance of minimum burden 2,5D hence its efficiency 25% while its 8D efficiency distance 100% tikis matter regardless of ground land type as its supporter. So that can be pulled by conclusion that piling with S = 3 D efficiency between 25 % - 30%

Item Type: Thesis (Other)
Additional Information: RSS 625.154 Kes p 2009
Uncontrolled Keywords: Efisiensi, Metode elastis, beban lateral, Efficiency, Elastic Method, lateral load
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA780.C29 Piling (Civil engineering)
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Anis Wulandari
Date Deposited: 21 Nov 2022 07:15
Last Modified: 21 Nov 2022 07:15
URI: http://repository.its.ac.id/id/eprint/95115

Actions (login required)

View Item View Item