Evaluasi Konsumsi Energi Dan Analisis Peningkatan Efisiensi Energi Pada Spam Cicalengka Perumda Tirta Raharja Kabupaten Bandung

Wardhani, Ayu Kusuma (2023) Evaluasi Konsumsi Energi Dan Analisis Peningkatan Efisiensi Energi Pada Spam Cicalengka Perumda Tirta Raharja Kabupaten Bandung. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6014211029-Master_Thesis.pdf] Text
6014211029-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (3MB) | Request a copy

Abstract

Berdasarkan Buku Kinerja BUMD Air Minum Tahun 2021, biaya energy rata-rata nasional adalah Rp 355,20/m3. Pada tahun 2021, biaya energi rata-rata SPAM Cicalengka Perumda Tirta Raharja Kabupaten Bandung mencapai Rp 767/m3 dengan nilai SEC rata-rata sebesar 0,76 kWh/m3. Pada bulan Agustus 2022 biaya energi dari SPAM Cicalengka adalah Rp 642,49/m3 dengan nilai SEC 0,59 kWh/m3. Nilai SEC yang melebihi 0,4 kWh/m3 mengindikasikan penggunaan listrik yang tinggi. Penelitian ini bertujuan untuk menganalisis penyebab tingginya konsumsi energi di SPAM Cicalengka dan memberikan rekomendasi peningkatan efisiensi energi untuk mengefisienkan pengggunaan listrik pada SPAM Cicalengka. Penelitian dilakukan dengan menganalisis kondisi eksisting pompa produksi maupun pompa distribusi pada SPAM Cicalengka. Metode analisis yang digunakan dalam penelitian ini adalah analisis teknis yang meliputi analisis pemakaian energi listrik dan analisis jaringan distribusi dengan software EPANET. Analisis kelayakan finansial dengan metode Payback Period dan Benefit Cost Ratio, dan analisis kelembagaan dengan metode ABK dan SWOT. Hasil penelitian menunjukkan bahwa penyebab tingginya penggunaan energi pada SPAM Cicalengka adalah tidak efisiennya pompa produksi dan tidak efisiennya pompa distribusi pada saat jam-jam minimum. Alternatif peningkatan efisiensi energi yang dinilai layak secara teknis dan finansial pada pompa submersible adalah dengan melakukan penggantian pompa, sedangkan alternative peningkatan efisiensi energi pada pompa distribusi adalah melakukan pemasangan VSD. Peningkatan efisiensi energi penggantian pompa submersible dan pemasangan VSD pada pompa distribusi mampu meningkatkan efisiensi penggunaan listrik sebesar 51,45%, menurunkan nilai SEC sistem eksisting dari 0,59 kWh/m3 menjadi 0,31 kWh/m3, dan menurunkan biaya energi dari Rp 642,5/m3 menjadi Rp 298,54/m3. Penerapan penggantian pompa submersible dan pemasangan VSD pada pompa distribusi secara finansial layak untuk dilaksanakan secara bersamaan dengan nilai payback period 8 bulan dan nilai BCR 3,83. Strategi penguatan kelembagaan untuk mendukung program peningkatan efisiensi energy yaitu penambahan personil, pendampingan operator wilayah, dan mengajukan pendampingan kepada instansi pembina terkait efisiensi energi.
==============================================================================================================================
Based on the 2021 Drinking Water BUMD Performance Book, the national average energy cost is IDR 355.20/m3. In 2021, the average energy cost of SPAM Cicalengka Perumda Tirta Raharja Bandung Regency will reach IDR 767/m3 with an average SEC value of 0.76 kWh/m3. In August 2022, the energy cost from SPAM Cicalengka was IDR 642.49/m3 with an SEC value of 0.59 kWh/m3. SEC values that exceed 0.4 kWh/m3 indicate high electricity usage. This study aims to analyze the causes of high energy consumption and provide recommendations to increase energy efficiency to make electricity usage more efficient in SPAM Cicalengka. The research was conducted by analyzing the existing conditions of production pumps and distribution pumps at Cicalengka SPAM. The analytical method used in this study is the technical analysis which includes an analysis of electricity consumption and an analysis of distribution networks with EPANETsoftware. The financial analysis feasibility uses the Payback Period and Benefit Cost Ratio methods, and the institutional analysis uses ABK and SWOT. The results showed that the cause of the high energy use in the Cicalengka SPAM was the inefficiency of production pumps due to the technological age of the old submersible pumps and the inefficiency of the distribution pumps during minimum hours. An alternative to increase energy efficiency that is considered technically and financially feasible for submersible pumps is replacing the pump. An alternative to increase energy efficiency for distribution pumps is installing a VSD. Increasing energy efficiency by replacing submersible pumps and installing VSD on distribution pumps can increase the efficiency of electricity use by 51.45%, reduce the SEC value of the existing system from 0.59 kWh/m3 to 0.31 kWh/m3, and reduce energy costs from IDR 642.5/m3 to IDR 298.54/m3. It is financially feasible to implement submersible pump replacement and VSD installation on distribution pumps simultaneously with a payback period of 8 months and a BCR value of 3.83. Institutional strengthening strategies to support energy efficiency improvement programs are adding personnel, assisting regional operators, and requesting assistance from supervisory agencies regarding energy efficiency.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Biaya Energi, Efisiensi Energi, Evaluasi Konsumsi Energi, SEC, SPAM Cicalengka, Energy Cost, Energy Efficiency, Energy Consumption Evaluation
Subjects: T Technology > TD Environmental technology. Sanitary engineering
T Technology > TD Environmental technology. Sanitary engineering > TD233 Water consumption
T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25101-(S2) Master Thesis
Depositing User: Anis Wulandari
Date Deposited: 16 Jan 2023 08:00
Last Modified: 16 Jan 2023 08:00
URI: http://repository.its.ac.id/id/eprint/95417

Actions (login required)

View Item View Item