Proyek Pembangunan Bendungan Bagong Kabupaten Trenggalek

JBS, I.D. Bagus and Dzikri, Taufiquh Hafid (2023) Proyek Pembangunan Bendungan Bagong Kabupaten Trenggalek. Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111940000008_03111940000059-Project_Report.pdf] Text
03111940000008_03111940000059-Project_Report.pdf
Restricted to Repository staff only

Download (11MB) | Request a copy

Abstract

Bendungan Bagong merupakan bendungan yang direncanakan pada Sungai Bagong dengan lokasi pekerjaan terletak di Desa Sumurup dan Desa Sengon, Kecamatan Bendungan, Kabupaten Trenggalek, Provinsi Jawa Timur. Bendungan Bagong mempunyai potensi multiguna, yaitu sebagai pengendali banjir, penyediaan air baku irigasi dan domestik, konservasi sumber daya air, dan tempat rekreasi. Proyek Bendungan Bagong terbagi menjadi dua paket pekerjaan. Paket I yang meliputi pekerjaan pembangunan jalan akses dan bendungan utama dikerjakan oleh ABIPRAYA – SACNA KSO. Paket II yang meliputi pekerjaan pembangunan jalan operasional, terowongan pengelak, bangunan pengambilan, bangunan pelimpah, dan bangunan fasilitas umum dikerjakan oleh PP-JATIWANGI KSO. Selain itu, supervisi pembangunan menjadi tanggung jawab KSO-RAYAKONSULT – CIRIA JASA ENGINEERING – BRAHMA SETA INDONESIA. Tugas khusus yang dikerjakan selama kerja praktik adalah menghitung potensi PLTA Bendungan Bagong yang dihasilkan dalam satu tahun yaitu sebesar 6833061,171 kWh dengan menggunakan jenis turbin Francis atau Turgo.
==============================================================================================================================
The Bagong Dam is a planned dam on the Bagong River where the work site is located in Desa Sumurup and Desa Sengon, Kecamatan Bendungan, Kabupaten Trenggalek, Provinsi Jawa Timur. The Bagong Dam has multi-purpose potential, such as flood control, irrigation and domestic raw water supply, water resource conservation, and a recreation area. The Bagong Dam project is divided into two work packages. Package I which includes the construction of access road and the main dam is carried out by ABIPRAYA – SACNA KSO. Package II which includes the construction of operational roads, tunnel, intake, spillway, and public facility buildings is carried out by PP-JATIWANGI KSO. In addition, construction supervision is the responsibility of KSO-RAYAKONSULT – CIRIA JASA ENGINEERING – BRAHMA SETA INDONESIA. The specific task that was carried out during the internship was to calculate the potential for the Bagong Dam hydropower produced in one year, namely 6833061,171 kWh using the Francis or Turgo type turbine.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: bendungan, kerja praktik, plta main dam, internship, hydropower
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Taufiquh Hafid Dzikri
Date Deposited: 24 Jan 2023 07:03
Last Modified: 24 Jan 2023 07:03
URI: http://repository.its.ac.id/id/eprint/95549

Actions (login required)

View Item View Item