Perencanaan Pembangkit Listrik Tenaga Mikrohidro di Sungai Kumbi Nusa Tenggara Barat

Phalosa, Wawan Abner (2023) Perencanaan Pembangkit Listrik Tenaga Mikrohidro di Sungai Kumbi Nusa Tenggara Barat. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111840000040-Undergraduate_Thesis.pdf] Text
03111840000040-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (5MB) | Request a copy

Abstract

Terdapat sekitar 250 kepala keluarga (KK) yang belum memiliki akses listrik di wilayah kaki Gunung Rinjani yakni di Desa Puncak Jeringo Kabupaten Lombok Barat. Estimasi kebutuhan listrik di wilayah tersebut diperkirakan sebesar12,25 kW pada saat jam puncak. Dengan komitmen pembenahan standar pelayanan masyarakat (SPM) yang berwawasan lingkungan dan berkelanjutan dari Pemerintah Daerah Lombok Barat direkomendasikan produksi listrik berasal dari proses pembangkitan yang bersih. Pembangkit listrik tenaga mikro hidro (PLTMH), sebagai salah satu pembangkit listrik energi terbarukan, dapat menjadi alternatif karena relatif sederhana serta biaya konstruksi dan emisi karbon yang rendah. Sungai Kumbi di Lombok Barat merupakan lokasi yang potensial untuk dibangun PLTMH karena debit dan topografi yang mendukung. Potensi PLTMH di Sungai Kumbi dapat menjadi solusi untuk memenuhi kebutuhan energi listrik di Kabupaten Lombok Barat khususnya di Desa Puncak Jeringo. Perencanaan PLTMH diawali dengan tahap persiapan berupa pengumpulan data dan studi literatur. Data tersebut antara lain adalah data debit rata-rata dan maksimum, data topografi, dan data penampang Sungai Kumbi. Data yang telah didapatkan kemudian dianalisis pada tahap analisis debit sungai yang meliputi analisis debit rata-rata untuk mendapatkan debit andalan PLTMH dan debit maksimum untuk perencanaan bendung pengambilan. Kemudian dilanjutkan dengan analisis dan perencanaan hidrolika untuk menentukan dimensi masing-masing bangunan pada PLTMH seperti bendung pengambilan, pintu pengambilan, kantong lumpur, headrace, head tank, dan pipa pesat. Selanjutnya dilakukan perhitungan terhadap beda tinggi efektif dimana beda tinggi total dikurangi dengan kehilangan energi yang terjadi. Setelah diketahui debit andalan dan beda tinggi efektifnya, ditentukan jenis turbin yang digunakan dan dilakukan perhitungan terhadap besar daya dan energi listrik yang dihasilkan. Hasil-hasil olahan tersebut kemudian disajikan dalam bentuk gambar perencanaan bangunan PLTMH Sungai Kumbi. Melalui Studi ini didapatkan hasil desain berupa bangunan PLTMH Sungai Kumbi yang terdiri dari bendung, intake, settling basin, headrace, head tank, penstock, dan powerhouse. Besar debit andalan 95% yang dimanfaatkan adalah Q95% = 0,8 m3/s dan dengan tinggi jatuh efektif (Heff) 17,1 m. Potensi daya listrik yang dibangkitkan adalah sebesar 118,164 kW dengan energi total yang dibangkitkan dalam setahun sebesar 1013,9 MWh.
==============================================================================================================================
Around 250 households near Mount Rinjani, in Puncak Jeringo Village, West Lombok do not have access to electricity nowadays. The electricity demand is estimated around 12,25 kW at peak hour. Considering local government commitment to sustainable and environmentally friendly public services, electricity production is expected from sustainable resources. Micro-hydro powerplant (MHPP) , one of a renewable energy, in Kumbi River is considered as an alternative solution giving its discharge and topography potential. Kumbi River MHPP can be a solution to meet a demand of electricity in West Lombok, especially in Puncak Jeringo Village. MHPP design consist of data collection and literature study, discharge analysis and waterwork design. Collected data used including mean and maximum discharge, topographic map, and Kumbi River cross-section. Flow duration curve and extreme discharge analysis are performed for power plant reliability and weir design respectively. MHPP waterwork design calculated in this study consist of intake weir, intake gate, settling basin, headraces, head tank, and penstock. Further calculation includes effective head requirement, type of turbine and potential power generated by system. Final design is presented into shop drawing for Kumbi River MHPP design. The results of this study deliver that Kumbi River MHPP’s building design consist of weir, intake, settling basin, headrace, head tank, penstock, and powerhouse. It utilizes 95% river’s discharge amount 0,8 m3/s and 17,1 m effective head. The design can produce electrical power up to 118,164 kW and total energy 1013,9 MWh in a year.

Item Type: Thesis (Other)
Uncontrolled Keywords: Microhydro Powerplant, Kumbi River, Electrical Energy, Renewable Energy, PLTMH, Sungai Kumbi, Energi Listrik, Energi Terbarukan.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC530 Flood control
T Technology > TC Hydraulic engineering. Ocean engineering > TC555 Spillways. Energy dissipation. Hydraulic jump.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Wawan Abner Phalosa
Date Deposited: 06 Feb 2023 08:21
Last Modified: 06 Feb 2023 08:21
URI: http://repository.its.ac.id/id/eprint/96180