PT PJB Unit Pembangkitan Cirata merupakan perusahaan yang bergerak dibidang Pembangkit Listrik Tenaga Air dengan berbagai macam rele proteksi sebagai pengamanan ketika terjadi gangguan pada sistem kelistrikan. Seiring dengan penambahan dan perubahan pada peralatan listrik, setting pengamanan pada rele proteksi perlu dilakukan evaluasi secara komprehensif demi menjaga keandalan sistem proteksi. Bedasarkan kasus di lapangan kinerja sistem proteksi perusahaan ini masih belum bisa dikatakan sebagai sistem proteksi yang handal. Hal ini dikarenakan setiap terjadi gangguan pada sistem kelistrikan bagian bawah (sisi beban) maka sistem akan terjadi blackout. Kasus ini diduga karena urutan pembukaan circuit breaker (CB) yang tidak sesuai oleh rele menyebabkan CB pada sisi beban tidak trip sehingga CB pada sisi atas akan membuka lebih cepat yang memungkinkan terjadinya blackout. Adanya kasus yang menyebabkan blackout ini akan memberikan efek tergangguanya sistem kelistrikan untuk melakukan produksi energi listrik sehingga perlu dilakukan proses evaluasi untuk mendapatkan setting rele proteksi yang tepat. Pada tugas akhir ini, dilakukan analisis kinerja sistem proteksi koordinasi existing rele arus lebih gangguan fasa, rele arus lebih gangguan tanah dan rele diferensial yang selanjutnya dilakukan evaluasi untuk menentukan urutan tripping rele proteksi yang tepat agar tidak terjadi blackout dan setting rele diferensial yang selektif ketika terjadi berbagai macam tipe gangguan. Hasil evaluasi setting dan koordinasi proteksi arus lebih gangguan fasa, rele arus lebih gangguan tanah, dan rele diferensial ini dapat menjadi rekomendasi bagi perusahaan ini dalam melindungi sistem kelistrikan dengan tepat dan handal.
================================================================================================================================
PT PJB Cirata Generation Unit is a company engaged in Hydroelectric Power Generation with various kinds of protection relays as security when there is a disturbance in the electrical system. Along with additions and changes to electrical equipment, the safety settings on the protection relay need to be evaluated comprehensively to maintain the reliability of the protection system. Based on the case in the field, the performance of this company's protection system still cannot be said to be a reliable protection system. This is because every time there is a disturbance in the lower part of the electrical system (load side), the system will black out. This case is suspected because the circuit breaker (CB) opening sequence that is not following the relay causes the CB on the load side not to trip so that the CB on the top side will open faster which allows a blackout to occur. The existence of cases that cause blackouts will have the effect of disrupting the electrical system to produce electrical energy, so it is necessary to carry out an evaluation process to get the right protection relay settings. In this final project, an analysis of the performance of the existing coordination protection system of overcurrent relays for phase faults, overcurrent relays for ground faults, and differential relays are carried out, and an evaluation to determine the correct sequence of tripping protection relays so that blackouts do not occur and selective differential relay settings when various types of faults occur. The results of the evaluation of the setting and coordination of phase fault and ground fault overcurrent protection can be a recommendation for this company in protecting the electrical system properly and reliably.

Item Type: Thesis (Other)
Uncontrolled Keywords: Blackout, Keandalan, Koordinasi Proteksi, Rele Proteksi, Protection Coordination, Protection Relay, Reliability
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Dhenie Prakash Prasetyo
Date Deposited: 20 Jul 2023 08:12
Last Modified: 20 Jul 2023 08:12
URI: http://repository.its.ac.id/id/eprint/98734

Actions (login required)

View Item View Item