Perhitungan Rencana Waktu Dan Biaya Pelaksanaan Proyek Gedung Bpkad (Badan Pengelola Keuangan Dan Aset Daerah) Provinsi Jawa Timur

Yulinda, Mitha and Ismawati, Icco Candra (2018) Perhitungan Rencana Waktu Dan Biaya Pelaksanaan Proyek Gedung Bpkad (Badan Pengelola Keuangan Dan Aset Daerah) Provinsi Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000025-10111500000027-Non_Degree.pdf]
Preview
Text
10111500000025-10111500000027-Non_Degree.pdf - Accepted Version

Download (73MB) | Preview
[thumbnail of 10111500000025-10111500000027-Non_Degree_Presentation.pdf]
Preview
Text
10111500000025-10111500000027-Non_Degree_Presentation.pdf - Accepted Version

Download (2MB) | Preview

Abstract

Gedung BPKAD (Badan Pengelola Keuangan Dan Aset Daerah) Provinsi Jawa Timur merupakan bangunan kantor 5 lantai dengan luas bangunan ± 1.450 m2, terletak di Jl. Johar No.19-21, Surabaya. Pada pembangunannya memerlukan biaya dan waktu yang efisien. Gedung BPKAD ini memiliki fungsi bangunan sebagai gedung perkantoran. Perhitungan perencanaan jadwal pelaksanaan pekerjaan struktur ditinjau dari segi waktu dan biaya pekerjaan dengan sumber referensi berupa buku dan pengalaman kontraktor.
Untuk perhitungan rencana anggaran biaya pelaksanaan dianalisa terlebih dahulu sesuai dengan standart harga yang ada di Kota Surabaya. Dalam menentukan biaya maka dilakukan analisa antara literatur yang digunakan maupun peraturan yang berlaku untuk mendapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisa mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project.
==================================================================================================
BPKAD Building (Finance and Regional Asset Management Agency) East Java Province is a 5-story office building with a building area of ± 1,450 m2, located on Jl. Johar No.19-21, Surabaya. On the construction requires cost and time efficient. BPKAD building has a building function as an office building. Calculation of schedule planning of the implementation of structural work in terms of time and cost of work with reference resources in the form of books and contractor experience.
For the calculation of the budget plan implementation costs are analyzed in advance in accordance with the standard price in the city of Surabaya. In determining the cost, an analysis is conducted between the literature used and the applicable regulations to obtain conformity with the conditions of field implementation. While in the calculation of the time of the analysis carried out starting from the production capacity, productivity, duration and preparation of each work schedule where this is done by using Microsoft Project tool.

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Yul p-1 3100019081272
Uncontrolled Keywords: budget plan implementation cost, analysis, comparison
Subjects: H Social Sciences > HB Economic Theory > HB846.2 Cost benefit analysis
H Social Sciences > HF Commerce
H Social Sciences > HF Commerce > HF5601 Accounting
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Mitha Yulinda
Date Deposited: 08 Jan 2019 07:41
Last Modified: 15 Oct 2020 07:27
URI: http://repository.its.ac.id/id/eprint/53396

Actions (login required)

View Item View Item