Studi kelayakan pelebaran jalan Bulu KM SBY 110+500- 118+000 kabupaten Tuban Jawa Timur

Harya S., Arif Ilmawan (2015) Studi kelayakan pelebaran jalan Bulu KM SBY 110+500- 118+000 kabupaten Tuban Jawa Timur. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
3111106023-Undergraduate_Theses-OK.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Kabupaten Tuban termasuk daerah yang dilalui jalur pantai utara jawa (pantura) yang merupakan jalur utama perdagangan di pulau jawa. Jalur pantura merupakan jalan nasional yang menghubungkan antar provinsi sehingga jalur pantura memiliki lalu lintas yang sang at padat. Hal ini menjadikan kabupaten Tuban sebagai daerah tarikan yang tinggi dan mengakibatkan lalu lintas yang terjadi semakin meningkat. Meningkatnya volume lalu - lintas dipengaruhi oleh meningkatnya jumlah kendaraan sehingga melebihi kapasitas jalan yang ada dan beralihnya fungsi jalan. Arus kendaraan yang padat mengakibatkan kemacetan dibeberapa ruas jalan yang terjadi pada jam sibuk . Hal ini mengakibatkan pembengkakan biaya yang harus dikeluarkan oleh pengguna jalan. Tujuan dari tugas Akhir ini untuk menganalisa apakah layak jika di ruas jalan tersebut dilakukan pelebaran yang ditinjau dari segi lalu lintas dan ekonomi jalan raya. Analisa yang akan dihitung antara lain analisa tingkat kinerja jalan berupa nilai Derajat Kejenuhan (DS), analisa perhitungan penghematan Nilai Waktu dan Biaya Operasional Kendaraan, analisa perhitungan Benefit Cost Ratio (BCR),dan analisa perhitungan Net Present Value (NPV). Analisa kelayakan pelebaran jalan Bulu Tuban ditinjau dari segi ekonomi yang akan ditentukan berdasarkan nilai penghematan BOK dan nilai waktu. BOK dan nilai waktu dianalisa pada saat kondisi eksisiting dan kondisi rencana dengan menggunakan metode Jasa Marga. Hasil analisa dari segi ekonomi diperoleh nilai saving Rp. 292.789.865.219,009 nilai BCR = 2,07 (BCR>1) dan nilai NPV = Rp. 108.782.277.806,73 (NPV>0) proyek dikatakan layak dilaksanakan. ============================================================================================ Tuban district is included in area that passed by the route of north coast of Java,which is the main route is national road that connect inter-provincial. So that the pantura road have a very high traffic.this matter makes Tuban district as a high attraction area and cause the traffic increasing.the increasing of traffic volume is caused by the increasing of the volume of vehicles that exceed the capacity of the road which exist and switching the function of the road.the dense flow of vehicles caused congestion in some segment of the road that occur at rush hour. This resulted in cost overruns which must be paid by the road users. the purpose of this final project is to analyze whether it is feasible if the segment of the road perform widening.which is reviewed in term of traffic and economy highway.analysis that will be calculated among others is analysis of the performance level in the value of the degree of saturation ,analysis of the time value and vehicle operation cost,analytical calculation of the benefit cost ratio and net present value calculation analysis. Which will be determined based on the value of the vehicle operating cost savings and time value.the vehicle operating cost and the value of time and the value of the plan by using the method of Jasa Marga.the result of economic analysis obtained by value saving is Rp. 292.789.865.219,009 Value of BCR = 2,07 (BCR> 1) and value of NPV= Rp. 108.782.277.806,73 (NPV> 0) this project declare feasible.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 625.7 Ari s
Uncontrolled Keywords: jalan Bulu – Tuban; studi kelayakan; BOK ============================================================================== Bulu Road – Tuban; Feasibility study; BOK
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements > TE175 Road and highway design
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: - Taufiq Rahmanu
Date Deposited: 28 Nov 2018 02:42
Last Modified: 28 Nov 2018 02:42
URI: https://repository.its.ac.id/id/eprint/60031

Actions (login required)

View Item View Item