Perencanaan kelistrikan untuk energi terbarukan di Kabupaten Bulungan dan Tana Tidung

Sari, Indah Purnama (2015) Perencanaan kelistrikan untuk energi terbarukan di Kabupaten Bulungan dan Tana Tidung. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
2511100042-Undergraduate_Theses.pdf - Published Version

Download (5MB) | Preview
[img]
Preview
Text
2511100042-paperpdf.pdf - Published Version

Download (375kB) | Preview
[img]
Preview
Text
2511100042-presentationpdf.pdf - Presentation

Download (2MB) | Preview

Abstract

Permintaan energi listrik menunjukkan peningkatan permintaan setiap tahunnya, namun penyediaan energi listrik yang ada tidak mampu mencukupi permintaan yang semakin meningkat. Beberapa unit layanan daerah di Kabupaten Bulungan hanya mampu melayani listrik tidak lebih dari 12 jam, sedangkan pemadaman bergilir juga masih terjadi di Kabupaten Tana Tidung. Kendala yang juga terjadi dalam pemenuhan kebutuhan listrik adalah ketersediaan sumber daya fosil untuk bahan baku energi listrik sudah semakin terbatas, sehingga dibutuhkan alternatif energi lainnya, salah satunya adalah energi terbarukan. Penelitian ini bertujuan untuk melakukan proyeksi kebutuhan beban listrik mendatang dan mengidentifikasi potensi sumber energi terbarukan di daerah setempat. Proyeksi kebutuhan beban listrik dilakukan dengan pendekatan ekonometri dan sektoral serta diselesaikan dengan software LEAP (Long Range Energy Planning). Dalam penelitian ini dilakukan identifikasi potensi sumber energi terbarukan di daerah setempat yang meliputi energi mikrohidro dan energi surya. Dari hasil identifikasi potensi energi terbarukan tersebut maka diberikan rekomendasi berupa perencanaan lokasi dan jumlah pembangkit sesuai hasil proyeksi sebelumnya. Untuk memastikan keandalan dan keberlanjutan produksi energi listrik, maka dalam penelitian ini juga dilakukan integrasi sistem produksi dengan pendekatan proses bisnis CIMOSA (Computer-Integrated Manufacturing for Open System Architecture). Selanjutnya dilakukan estimasi biaya pembangunan dan analisa manfaat-biaya (Benefit Cost Ratio) untuk menilai kelayakan pembangkit listrik energi terbarukan tersebut. Hasil analisa menunjukkan potensi energi terbarukan yang tersedia di kedua Kabupaten ini dapat memenuhi kebutuhan listrik 11,974 rumah tangga di Kabupaten Bulungan dan 2,592 rumah tangga di Kabupaten Tana Tidung dari tahun 2015-2030. Pembangunan kedua pembangkit ini juga dinilai layak hingga tahun 2030 dengan nilai BCR lebih dari satu. ========= Electrical energy demand was increased, but the supply was unable to meet the demand. Kabupaten Bulungan and Kabupaten Tana Tidung are two district in North Kalimantan Province were also faced the supply problem. Some services units in Kabupaten Bulungan and Kabupaten Tana Tidung only capable of serving electricity no more than 12 hours per day. The availability of fossil resources as the raw material of energy electricity has become more limited so that there is a need for other energy alternative, one of them is renewable energy. This study aimed to conduct electricity forecasting from year 2015 to 2030 and identify potential sources of renewable energy in the local area. Electricity forecasting in this study was conducted by econometrics and sectoral approach well as solved with software LEAP (Long Range Energy Planning). Furthermore, it has been conduct identified the potential of renewable energy sources in the local area which includes micro-hydro energy and solar energy. Based on results above, the study give reccomendation of location and number of power plants in Kabupaten Bulungan also Tana Tidung. To ensure the reliability and sustainability of the electricity production, so in this study was also conducted with the system integration production with business process approach CIMOSA (Computer-Integrated Manufacturing for Open System Architecture). Furthermore, estimation cost of construction and cost-benefit analysis (Benefit Cost Ratio) was also conducted to assess the feasibility of the renewable energy power plants. The result show that the potential of renewable energy can meet the electricity needs of 11.974 households in Bulungan and 2,592 households in Tana Tidung from year 2015 to 2030. Construction of two plants is also considered feasible until 2030 with value of BCR more than one.

Item Type: Thesis (Undergraduate)
Additional Information: RSi 333.793 2 Sar p 2511100042
Uncontrolled Keywords: Analisis Manfaat Biaya (BCR), Energi Mikrohidro, Energi Surya, Energi Terbarukan, LEAP, Benefit Cost Ratio (Bcr), LEAP, Microhydro Energy, Renewable Energy, Solar Energy
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD9685.A2 Electric utilities. Electrification
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 14 Mar 2019 04:47
Last Modified: 14 Mar 2019 04:47
URI: https://repository.its.ac.id/id/eprint/62498

Actions (login required)

View Item View Item