Perencanaan Instalasi Pengolahan Air Limbah (Ipal) Komunal Dan Perencanaan Ulang Instalasi Air Bersih Pada Pesantren Al-Aqobah Kabupaten Jombang

Albana, Muhammad Khoiri (2016) Perencanaan Instalasi Pengolahan Air Limbah (Ipal) Komunal Dan Perencanaan Ulang Instalasi Air Bersih Pada Pesantren Al-Aqobah Kabupaten Jombang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
1314105043-undergraduate-theses.pdf - Published Version

Download (1MB) | Preview

Abstract

Pesantren Al-Aqobah jombang merupakan salah satu lokasi yang kurang baik dalam mengelola limbah domestiknya yang masih menggunakan tangki septik untuk black water dengan efisiensi removal COD sebesar 25-50% dan pembuangan grey water ke selokan. Bukan hanya permasalahan air limbah. Pelayanan air bersih pesantren ini pun terkadang tidak memenuhi tiga aspek unit operasi penting yakni kuantitas, kualitas, dan kontinuitas. Permasalahan tersebut dapat diselesaikan dengan dibangunnya Instalasi Pengolahan Air Limbah (IPAL) yang komprehensif berupa Anaerobic Baffled Reactor (ABR) untuk black water yang terdiri dari bak pengendap dan 4 kompartemen sehingga memiliki efisiensi removal sebesar 86,58% BOD, 82,32% COD, dan 65% untuk TSS dan grey water yang sebelumnya dilakukan pre-treatment pada grease trap. Kemudian untuk pelayanan air bersih dievaluasi dan didapat beberapa pipa distribusi yang harus diganti agar memenuhi kecepatan alirnya. Selain itu juga ditambahkan rooftank agar memenuhi kebutuhan pada jam puncak. Serta digunakannya desinfeksi berupa ultra violet agar memenuhi kualitas air bersih. ============================================================ Al-Aqobah islamic boarding school is still treating their black water using septic tank which has removal eficiency only 25%-50% and no treatment for the grey water. Fresh water instalation is also worst. Sometimes it couldn’t fulfill the aspect of quantity, quality, and continuity. That problem can be solve by build comprehensive waste water treatment such as annaerobic baffled reactor (ABR) for the black water which consist of sattler and 4 compartments. This ABR has removal eficiency 86,58% for BOD, 82,32% for COD, and 65% for TSS. The grey water is also treated by ABR but using grease trap as pre-treatment. Then for fresh water instalation should evaluate. Some of distribution pipe must be replace with new pipe diameter for fulfilling flowrate aspect. Adding some rooftank for supplying peak hour. Then using ultra violet desinfection for fulfilling fresh water quality aspect.

Item Type: Thesis (Undergraduate)
Additional Information: RSL 628.362 Alb p
Uncontrolled Keywords: Anaerobic Baffled Reactor (ABR), grease trap, diameter pipa, rooftank, desinfeksi
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD430 Water--Purification.
Divisions: Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 24 Oct 2019 08:32
Last Modified: 24 Oct 2019 08:32
URI: https://repository.its.ac.id/id/eprint/71397

Actions (login required)

View Item View Item