Perencanaan waktu dan estimasi biaya pelaksanaan pekerjaan struktur jembatan kali Sidoduwe Kabupaten Mojokerto Jawa Timur

Prasetiya, Denny Tri Budi (2015) Perencanaan waktu dan estimasi biaya pelaksanaan pekerjaan struktur jembatan kali Sidoduwe Kabupaten Mojokerto Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3113040505-Presentation-3113040505-presentationpdf.pdf

Download (1MB) | Preview
[img]
Preview
Text
3113040505-NonDegree.pdf

Download (7MB) | Preview

Abstract

Seiring perkembangan jaman, suatu pembangunan bertujuan untuk mencapai nilai ekonomis dari suatu proyek dengan mengutamakan efesiensi waktu dan biaya pada suatu pekerjaan. Jembatan Kali Sidoduwe dibangun pada jalan tol Surabaya - Mojokerto Seksi IV. Jembatan ini terletak pada STA 37+592 – STA 37+659, yang mana melintasi 1 buah jalan desa dan sungai Kali Sidoduwe. Mengacu dari latar belakang tersebut maka, dalam tugas akhir ini penulis membahas mengenai perencanaan waktu dan estimasi biaya pelaksanaan. Jembatan Kali Sidoduwe ini mempunyai bentang sepanjang 66 m. Dengan terdiri dari dua abutment dan dua pilar. Berdasarkan hasil analisa proyek akhir ini, pembangunan struktur Jembatan Kali Sidoduwe dapat diselesaikan dalam waktu 310 hari. Dan diperlukan anggaran biaya sebesar Rp 24.678.889.600 (Dua puluh empat miliar enam ratus tujuh puluh delapan juta delapan ratus delapan puluh sembilan ribu enam ratus). ======================================================================================================== With the development of times, development aims to achieve an economic value of project with prioritize on efficient time and cost of a job. Kali Sidoduwe bridge built on toll road Surabaya - Mojokerto Section IV. The bridge is located at STA 37 + 592 - STA 37 + 659, which crosses 1 piece of village roads and river Kali Sidoduwe. Referring to the background then, in this final project the author discusses the planning time and the estimated cost of construction work. This bridge Kali Sidoduwe have span along 66 m. With consists of two abutments and two pillars. Based on the result of this analysis final project, structure development bridge Kali Sidoduwe can be solved during 310 days and need budget cost of Rp 24,678,889,600 (Twenty-four billion six hundred and seventy-eight million eight hundred and eighty-nine thousand six hundred).

Item Type: Thesis (Diploma)
Additional Information: RSS 624.2 Pra p
Uncontrolled Keywords: Jembatan Kali Sidoduwe, Anggaran Biaya Yang Diperlukan
Subjects: T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: - Taufiq Rahmanu
Date Deposited: 25 Nov 2019 07:52
Last Modified: 25 Nov 2019 07:52
URI: https://repository.its.ac.id/id/eprint/72027

Actions (login required)

View Item View Item