Desain Dredger Berbasis Jalur Sungai Pada Program “Tol Sungai Cikarang Bekasi Laut (Cbl) - Tanjung Priok”

Jaelani, MUHAMMAD Muhammad Rizal Arsyad (2016) Desain Dredger Berbasis Jalur Sungai Pada Program “Tol Sungai Cikarang Bekasi Laut (Cbl) - Tanjung Priok”. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[img]
Preview
Text
4112100070-Undergraduate_Thesis.pdf - Published Version

Download (5MB) | Preview

Abstract

Presiden Joko Widodo mengadakan pertemuan bersama Direktur Utama PT. Pelindo II (Persero) dan Menteri Kementrian Badan Usaha Milik Negara (BUMN) terkait dengan rencana pembangunan program Tol Sungai di jalur Sungai Cikarang Bekasi Laut (CBL). Program Tol Sungai yang dimaksud adalah mengembangkan jalur angkutan kontainer berbasis jalur sungai sepanjang 25 mil laut dari (kawasan industri) Cikarang, Jawa Barat menuju ke Pelabuhan Tanjung Priok melalui sungai CBL via Marunda, Jakarta Utara. Program ini bertujuan untuk mengoptimalkan fungsi sungai atau kanal untuk jalur distribusi barang guna menekan biaya transportasi logistik yang selama ini melalui jalur darat. Menanggapi rencana pemerintah dalam program pembangunan Tol sungai Cikarang menuju Pelabuhan Tanjung Priok, maka perlu dilakukan kegiatan pengerukan awal dan kegiatan pemeliharaan secara berkala pada sungai guna menjaga kedalaman sungai CBL. Oleh karena itu, dibutuhkan sebuah kapal keruk yang diharapkan dapat menjadi solusi untuk melakukan pekerjaan pengerukan pada sungai CBL. Jenis kapal keruk yang dipilih adalah jenis Trailing Suction Hopper Dredger (TSHD), mengingat jenis kapal keruk ini memiliki karakteristik yang cocok dengan kriteria dan kondisi sungai CBL. Untuk mendapatkan ukuran utama TSHD yang optimum, digunakan metode optimization design approach dengan bantuan fitur solver pada program Microsoft Excel dengan menjadikan biaya pembangunan paling minimum sebagai fungsi objektif, serta adanya batasan-batasan dari persyaratan teknis dan regulasi yang ada. Dari proses optimisasi, didapatkan hasil ukuran utama optimum TSHD adalah L=50,811 m, B=12,447 m, H=4,779 m, TFW=3,142 m, dan TSW=3,065 m dengan estimasi biaya pembangunan sebesar $1.213.905,69 atau setara dengan Rp16.600.160.326 ===========================================================================================President Joko Widodo held a meeting with President Director of PT. Pelindo II (Persero) and Minister of Badan Usaha Milik Negara (BUMN) Ministry related to the development plan of Tol Sungai program on Cikarang Bekasi Laut (CBL) river. The purpose of Tol Sungai program is to develop an inland access waterway container-based transport system from Cikarang Industrial Area, West Java to Port of Tanjung Priok along 25 nautical miles through Cikarang Bekasi Laut (CBL) river via Marunda, North Jakarta. The program aims to optimize the function of river or canal for distribution of goods, in order to reduce logistic cost for transportation through road. Responding to government’s plans in development Tol Sungai program from Cikarang to the Port of Tanjung Priok, it is necessary to do the capital dredging activities and maintenance dredging activities on the river in order to keep the depth of CBL river. Therefore, dredger is expected to be a solution to do the dredging work on the CBL river. The selected type of dredger is Trailing Suction Hopper Dredger (TSHD), considering this type of dredger has characteristics that match the criteria and conditions of the CBL river. In order to obtain optimum particular dimensions, an optimization design approach, assisted by solver that featured in Microsoft Excel by making the minimum building cost as an objective function as well as the limitations of the technical requirements and existing regulations – has been conducted. Based on the result of optimization process, the optimum TSHD’s particular dimensions are L=50,811 m, B=12,447 m, H=4,779 m, TFW=3,142 m, dan TSW=3,065 m with building cost estimation of $1.213.905,69 or equal to Rp16.600.160.326

Item Type: Thesis (Undergraduate)
Additional Information: RSPe 623.828 Jae d
Uncontrolled Keywords: pengerukan, Sungai Cikarang Bekasi Laut (CBL), Tol Sungai, Trailing Suction Hopper Dredger (TSHD)
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 21 Feb 2020 02:27
Last Modified: 21 Feb 2020 02:27
URI: https://repository.its.ac.id/id/eprint/75089

Actions (login required)

View Item View Item