Menentukan Rute Menara Transmisi 150kV Menggunakan Metode FAHP (Fuzzy Analytical Hierarchy Process) dari Gardu Induk PLTA Larona ke Gardu Induk PLTA Balambano di PT. Vale Indonesia Tbk

Muis, Abdul (2020) Menentukan Rute Menara Transmisi 150kV Menggunakan Metode FAHP (Fuzzy Analytical Hierarchy Process) dari Gardu Induk PLTA Larona ke Gardu Induk PLTA Balambano di PT. Vale Indonesia Tbk. Masters thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
02411850077041-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (4MB) | Request a copy

Abstract

PT Vale Indonesia Indonesia, Tbk (PTVI), adalah perusahaan pertambangan mineral yang memproduksi nikel sebagai produk utamanya. PTVI membutuhkan keandalan pasokan daya yang tinggi dari pembangkit listrik tenaga air (PLTA) ke pembangkit listrik thermal untuk di alirkan ke semua fasilitas produksi sehingga dapat memproduksi nikel sesuai yang ditargetkan. Salah satu peralatan penting untuk menjaga agar ketersediaan listrik dapat terpenuhi adalah menara saluran transmisi. Kegagalan menara saluran transmisi akan memiliki efek bencana pada operasi produksi nikel. PTVI akan kehilangan 165 MW jalur menara saluran transmisi Larona gagal dan sisi lain akan kehilangan 200 MW jalur transmisi menara Balambano gagal. Sehingga untuk mendukung ketersediaan listrik secara terus menerus pembangunan menara saluran transmisi 150 KV jalur 5 (Line 5) dari gardu induk Larona ke gardu induk Balambano. Untuk menentukan pembangunan jalur menara transmisi ini memiliki banyak pertimbangan yang harus diperhatikan karena masing-masing jalur alternatif mempunyai kelebihan dan kekurangan dari berbagai aspek. Metode yang akan digunakan untuk menyelesaiakan permasalahan ini adalah metode FAHP (Fuzzy Analytical Hirercy Process). Hasil nilai akhir pada setiap alternatif adalah 0.477 untuk North Route, 0.364 untuk Middle Route dan 0.159 untuk South Route. Berdasarkan hasil tersebut, penulis merekomendasikan manajemen PT. Vale Indonesia, sebagai pemilik dan operator pembangkit listrik tenaga air, memilih North Route untuk rencana pembangunan menara transmisi 150kV. ====================================================================================================== PT Vale Indonesia Indonesia, Tbk (PTVI), is a mineral mining company that produces nickel as its main product. PTVI requires high reliability of power supply from hydroelectric power (PLTA) to thermal power plants to be distributed to all production facilities so that it can produce nickel as targeted. One of the important equipment to maintain electricity availability can be met is the transmission line tower. Failure of the transmission line tower will have a disastrous effect on nickel production operations. PTVI will lose 165 MW of the failed Larona transmission line tower and the other side will lose 200 MW of the failed Balambano tower transmission line. To support the continued availability of electricity, the construction of a 150 KV transmission line tower line 5 from the Larona switchyard to the Balambano switchyard. To determine the construction of this transmission tower line has many considerations that must be considered because each alternative path has advantages and disadvantages from various aspects. The method that will be used to solve this problem is the FAHP (Fuzzy Analytical Hirercy Process) method. The final value for each alternative is 0.477 for North Route, 0.364 for Middle Route and 0.159 for South Route. Based on these results, the authors recommend the management of PT. Vale Indonesia, as the owner and operator of the hydroelectric power plant, chose North Route for the planned construction of the 150kV transmission tower.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Gardu induk Larona, Gardu induk Balambano, saluran transmisi menara 150kV, Fuzzy Analytical Hirercy Process. ==================================================================================================== Larona Switchyard, Balambano Switchyard, 150kV tower transmission line, Fuzzy Analytical Hirercy Process.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
T Technology > T Technology (General) > T58.62 Decision support systems
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26101-(S2) Master Thesis