Laporan Kerja Praktek Proyek Pembangunan Bintaro Jaya Xchange Mall Tahap II

Nilamsari, Nilamsari and Putri, Amirahhanan Shiyamirahmah (2021) Laporan Kerja Praktek Proyek Pembangunan Bintaro Jaya Xchange Mall Tahap II. Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111840000106_03111840000157-Project_Report.pdf]
Preview
Text
03111840000106_03111840000157-Project_Report.pdf - Accepted Version

Download (10MB) | Preview

Abstract

Sebagai salah satu sarana untuk menambah wawasan mahasiswa mengenai dunia kerja dan bentuk aplikasi nyata ilmu yang telah diajarkan melalui kelas perkuliahan di lapangan, Departemen Teknik Sipil ITS Surabaya mewajibkan mahasiswa mengambil mata kuliah Kerja Praktek untuk menyelesaikan studinya. Pelaksanakan Kerja Praktek berfungsi sebagai transfer knowledge dan experience guna menjadi bekal bagi Mahasiswa Teknik Sipil agar siap berkecimpung di dunia kerja.
Pencetakan lulusan perguruan tinggi sebagai sumber daya manusia yang berkualitas, berkepribadian yang mantap, dan berkompeten dalam hal intelektualitas memerlukan partisipasi dan kooperasi unsur yang terlibat dalam Sistem Pendidikan Nasional. Dunia kerja yang memiliki lapangan nyata dapat menjadi tolok ukur keberhasilan Sistem Pendidikan Tinggi dengan menguji ketahanan dan kesiapan mahasiswa apabila diterjunkan ke lapangan. Dalam hal ini, PT. Jaya Konstruksi, Tbk memberikan kesempatan bagi kami untuk belajar di Proyek Pembangunan Bintaro Jaya Xchange Tahap 2.
Kerja Praktek dilaksanakan dalam rentang waktu dua bulan dengan jam kerja 16 – 40 jam setiap pekan. Seluruh kegiatan kerja praktek yang kami lakukan berada di bawah pengawasan dan bimbingan dari Divisi Quality Control (QC), Quantity Surveyor (QS), dan Bar Bending Schedule (BBS). Kerja Praktek dilakukan dengan mengamati pengawasan dan pelaksanaan konstruksi paket pekerjaan mall, hotel, oceanarium, gedung parkir, skybridge dan tunnel.
=======================================================================================================
To broaden students' knowledge about the world of work and forms of real application of knowledge that has been taught through class lectures in the field, The Department of Civil Engineering ITS Surabaya requires students to take an Internship Course to complete their studies. The implementation of practical work functions as a transfer of knowledge and experience to become a provision for Civil Engineering Students thus ready to enter the world of work.
Producing college graduates as qualified human resources, steadfast, and competent in terms of intellectuality needs participation and cooperation of elements involved in the National Education System. The working world which has a real field can be a benchmark of the success of the Higher Education System by assessing the resilience and readiness of students when deployed to the field. In this case, PT. Jaya Konstruksi, Tbk provides an opportunity for us to study in Bintaro Jaya Xchange Development Project Phase 2.
Practical Work is conducted in a span of two months with working hours 16 – 40 hours every week. All practical work activities that we do are under supervision and guidance from the Quality Control (QC) Division, Quantity Surveyor (QS) Division, and Bar Bending Schedule (BBS) Division. Practical work is carried out by observing the controlling and execution of construction work packages for malls, hotels, oceanariums, parking buildings, sky bridges, and tunnels.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: project organization, project management, upper-structure construction method, organisasi proyek, manajemen proyek, metode konstruksi bangunan atas
Subjects: T Technology > TH Building construction > TH1461 Concrete construction.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
T Technology > TH Building construction > TH900+ Construction equipment in building construction
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Amirahhanan Shiyamirahmah Putri
Date Deposited: 07 Jan 2022 08:53
Last Modified: 07 Jan 2022 08:53
URI: http://repository.its.ac.id/id/eprint/92187

Actions (login required)

View Item View Item