Items where Author is "Setiawan, Wahyu Eko"

Group by: Item Type | No Grouping
Number of items: 1.

Setiawan, Wahyu Eko (2023) Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Tower Hotel Aston Kabupaten Sumenep dengan Menggunakan Sistem Perancah Perth Construction Hire (PCH). Other thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Sat Nov 23 13:41:24 2024 UTC.