Items where Author is "Wibowo, Aji Bagus"

Group by: Item Type | No Grouping
Number of items: 1.

Wibowo, Aji Bagus (2021) Analisis Faktor Pengaruh Lead Time Pembangunan Built To Suit (B2S) Menara Telekomunikasi (Studi Kasus: PT. Tower Bersama Infrastructure, Tbk.). Masters thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Sat Nov 23 14:17:08 2024 UTC.