Items where Division is "Civil Engineering" and Year is 2018

Group by: Creators | Item Type | No Grouping
Number of items: 3.

Akbar, Rexy Chalid (2018) Analisis Perbandingan Biaya Dan Waktu Penyambungan Pengelasan Tiang Pancang Posisi Tidur Dan Posisi Berdiri Dengan Metode Preboring Hyperstraight Pada Proyek Pltu Batang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Christopher, Kevin (2018) Perencanaan Struktur Gedung Wisma Pondok Indah menggunakan Steel Plate Shear Wall (SPSW). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Yudistira, Tantyo (2018) Perencanaan Pembangunan Underpass Gedangan, Sidoarjo Ditinjau Dari Segi Ekonomi Jalan Raya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Tue Sep 17 18:42:58 2024 UTC.