Perhitungan Waktu, Biaya Pelaksanaan dan Rencana Keselamatan Konstruksi (RKK) Struktur Atas Gedung Apartemen Suncity Residence Sidoarjo

Bachrudin, Muhammad Aziz (2022) Perhitungan Waktu, Biaya Pelaksanaan dan Rencana Keselamatan Konstruksi (RKK) Struktur Atas Gedung Apartemen Suncity Residence Sidoarjo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201026-Undergraduate_Thesis.pdf] Text
2035201026-Undergraduate_Thesis.pdf

Download (5MB)

Abstract

Penyusunan proyek akhir yang berjudul “Perhitungan Waktu, Biaya Pelaksanaan dan Rencana Keselamatan Konstruksi (RKK) Struktur Atas Gedung Apartemen Suncity Residence Sidoarjo” ini menggunakan bangunan gedung Apartemen Suncity Residence Sidoarjo, yang berada di kabupaten Sidoarjo. Proyek pembangunan gedung ini terdiri dari 3 basement dan 27 lantai hunian dengan atap dak beton. Perhitungan waktu dan biaya pelaksanaan dihitung berdasarkan metode pelaksanaan yang digunakan sesuai dengan teori dan ilmu dari berbagai referensi yang disebutkan dalam kepustakaan serta dikaitkan dengan kondisi lapangan. Sehingga dengan metode pelaksanaan yang tepat maka dihasilkan waktu dan biaya yang efektif. Sedangkan untuk penyusunan jadwal tiap item pekerjaan dilakukan menggunakan bantuan software Microsoft Project dan Kurva S. Dari perencanaan yang telah disusun didapatkan hasil durasi pelaksanaan adalah 434 hari dengan total biaya pelaksanaan yaitu sebesar Rp. 77.679.374559,93-, sedangkan untuk biaya K3 adalah sebesar Rp. 1.187.072.000,00,- yaitu dengan prosentasi 1,53% dari biaya pelaksanaan.
===============================================================================================================================
The preparation of the final project entitled "Calculation of Time, Implementation Costs and Construction Safety Plan (RKK) for the Upper Structure of the Suncity Residence Sidoarjo Apartment Building" uses the Suncity Residence Sidoarjo Apartment building, which is located in Sidoarjo district. This building construction project consists of 3 basements and 27 residential floors with non-concrete roofs. The calculation of implementation time and cost is calculated based on the implementation method used in accordance with the theory and science from various references mentioned in the literature and associated with field conditions. So that with the right implementation method, it is time and cost effective. Meanwhile, the preparation of the schedule for each work item is carried out using the help of Microsoft Project software and the S Curve. From the planning that has been prepared, the results of the implementation duration
are 434 days with a total implementation cost of Rp. 77.679.374559,93,-, while the cost of K3 is Rp. 1.187.072.000,00,- with a percentage of 1.53% of the implementation cost.

Item Type: Thesis (Other)
Additional Information: RSIS 692.5 Bac p-1 2022
Uncontrolled Keywords: Kata kunci : Waktu dan biaya pelaksanaan, penjadwalan, kurva S, RKK ; implementation time and cost, scheduling, S curve
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Mr. Marsudiyana -
Date Deposited: 20 Nov 2024 01:44
Last Modified: 20 Nov 2024 01:44
URI: http://repository.its.ac.id/id/eprint/115795

Actions (login required)

View Item View Item