Perencanaan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) pada Struktur Bagian Atas Pembangunan Gedung Fakultas Ilmu Keolahragaan Universitas Negeri Malang

Putri, Nia Fergia (2019) Perencanaan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) pada Struktur Bagian Atas Pembangunan Gedung Fakultas Ilmu Keolahragaan Universitas Negeri Malang. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000034-Undergraduate_Theses.pdf]
Preview
Text
10111815000034-Undergraduate_Theses.pdf

Download (5MB) | Preview

Abstract

Pada tugas akhir ini penyusun mengambil objek gedung Fakultas Ilmu Keolahragaan Universitas Negeri Malang 7 lantai + 1 basement yang terletak di Malang. Pengambilan tema ini dimaksudkan agar dapat membantu perusahaan menyusun sistem manajemen K3 perusahaan dan juga agar dapat membantu mengurangi kecelakaan dalam bekerja. Bangunan gedung ini akan ditinjau dari segi K3 pada lantai 2, 5 dan lantai 7. Untuk lantai 2 berada pada ketinggian 5m, lantai 5 pada ketinggian 25m dan lantai 7 pada ketinggian 35m. Selain mengidentifikasi bahaya, menentukan pengendalian risikonya, juga direncanakan anggaran biaya K3 nya pada gedung ini. Untuk identifikasi bahaya dan pengendalian risiko akan menggunakan Teknik Analisis HAZOP. Identifikasi bahaya akan mengacu pada peraturan – peraturan yang berlaku salah satunya adalah Peraturan Menteri No 05 Tahun 2014 tentang Sistem Manajemen K3. Untuk perencanaan anggaran biaya K3 sendiri akan mengacu pada Surat Edaran Menteri PU No.66 Tahun 2015 tentang perhitungan biaya. Pada proyek ini akan menggunakan 2 jenis metode pelaksanaan. Perbedaan metode pelaksanaan hanya pada penggunaan alat berat. Untuk metode 1 menggunakan alat berat mobil crane, sedangkan metode 2 akan menggunakan tower crane. Metode 1 akan dipakai untuk pengerjaan lantai 2 dengan ketinggian 4m. Sedangkan metode 2 akan digunakan untuk pengerjaan lantai 5 dan lantai 7 dengan ketinggian 25m dan 35 m. Dari hasil analisis perencanaan ini, untuk lantai 2 terdapat 185 analisa potensi bahaya, lantai 5 terdapat 166 analisa potensi bahaya dan 170 analisa potensi bahaya untuk lantai 7. Potensi bahaya tersebut terdiri dari golongan risiko ekstirm, risiko tinggi, risiko sedang dan risiko rendah. Untuk faktor penyebab bahaya sendiri akan ditinjau dari faktor manusia, peralatan, proses, dan lingkungan kerja. Untuk hasil perhitungan anggaran biaya K3 pada proyek ini sejumlah Rp 1.265.175.000,00
=================================================================================================================================
In this final project, author took the object of Fakultas Ilmu Keolahragaan Universitas Negeri Malang with 7 floors + 1 basement located in Malang. Taking this theme allows to help companies develop enterprise safety management systems and also to help reduce accidents in workplace. The building will be reviewed in terms of Occupational Safety and Health Management System (OHS) on the 2nd, 5th and 7th floors. For the 2nd floor at 5m , 10th floor at 25m and 25th floor at 35m. In addition, it determines the risk control, as well as the cost of Occupational Safety and Health Management System (OHS) cost budget in this building. To identificate the hazard and its control will use HAZOP Analysis Technique. Hazard identification will apply to the applicable regulations, which is Ministerial Regulation No. 05 of 2014 on OHS Management System. For budget planning Occupational Safety and Health Management System (OHS) cost itself will reference at Circular Letter of Minister of Public Works No.66 Year 2015 about cost calculation of Occupational Safety and Health Management System In this project will use 2 types of implementation methods. Different methods of handling only on the use of heavy equipment. For method 1 using truck crane, while method 2 will use tower crane. Method 1 will be used for floor work with 5m height. While method 2 will be used for work on floor 5 and floor 7 with height 25m and 35 m. From the results of this analysis, for the 2nd floor there are 185 potential hazards, 5th floor 166 potential hazards and 170 potential hazards for 7th floor. The potential hazard consists of class of risk. For hazardous factors will be reviewed from human factors, equipment, processes, and work environment. For the calculation of Occupational Safety and Health Management System (OSH) cost budget at the moment is Rp 1.265.175.000,00

Item Type: Thesis (Other)
Additional Information: RSIS 690.73 Put p-1 2019
Uncontrolled Keywords: Bangunan gedung, Sistem Manajemen Keselamatan dan Kesehatan Kerja, HAZOP, RAB K3
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Nia Fergia
Date Deposited: 28 Aug 2023 05:01
Last Modified: 28 Aug 2023 05:01
URI: http://repository.its.ac.id/id/eprint/64177