Rahma, Aping Nurfitri (2019) Perhitungan Rencana Penjadwalan Waktu dan Biaya pada Pelaksanaan Struktur Utama Dengan Metode Half Slab pada Hotel Volendam Roterdam Malang. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111815000018-Undergraduate_Theses.pdf Download (9MB) | Preview |
Abstract
Pembangunan Proyek Hotel Volendam Rotterdam ini sejumlah 8 lantai termasuk lantai atap dengan struktur beton bertulang dengan luas lahan 4075,5 m2 dan luas bangunan 1229 m2 yang berada di jalan Panderman Hill, Malang. Proyek pembangunan ini merupakan proyek dengan menggunakan struktur beton yang dilakukan dengan metode pengecoran Half Slab Precast yaitu setengah pelat yang dicor ditempat dan pelat precast. Untuk perhitungan rencana anggaran biaya pelaksanaan dianalisis terlebih dahulu sesuai dengan standar harga kota Malang, harga survey dan juga harga brosur perusahaan alat berat dan material. Dalam menentukan biaya maka dilakukan analisa antara literatur yang digunakan maupun peraturan yang berlaku untuk mendapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisa mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan metode PDM menggunakan alat bantu Microsoft Project. Berdasarkan hasil analisa didapat rencana anggaran pelaksanaan untuk pembangunan Hotel Volendam Rotterdam Malang dengan metode Half slab Precast sebesar Rp. 14.574.126.695 (Empat Belas Milyar Lima Ratus Tujuh Puluh Empat Juta Seratus Dua Puluh Enam Ribu Enam Ratus Sembilan Puluh Lima Rupiah) dengan waktu pelaksanaan proyek selama 365 hari kerja.
=================================================================================================================================
The construction of the Rotterdam Volendam Hotel Project consists of 8 floors including a roof with reinforced concrete structures with a land area of 4075.5 m2 and a building area of 1229 m2 located on Panderman Hill road, Malang. This construction project is a project using concrete structures carried out by the Precast Half Slab casting method, which is half the plate casted in place and precast plates. For the calculation of the implementation of the budget plan analyzed first in accordance with the standard price of the city of Malang, the price of the survey and also the price of company brochures of heavy equipment and materials. In determining the costs, an analysis is carried out between the literature used and the applicable regulations to get conformity with the conditions of the field implementation. While the calculation of the implementation time is analyzed starting from the production capacity, productivity, duration and scheduling of each work where this is done by using the PDM method using Microsoft Project tools. Based on the results of the analysis obtained by the budget plan for the construction of the Volendam Hotel in Malang Malang with the Half slab Precast method of Rp. 14.574.126.695 (Fourteen Billion Five Hundred Seventy Four Million One Hundred Twenty Six Thousand Six Hundred Ninety Five Rupiahs) with the project implementation time of 365 working days.
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSIS 690.85 Rah p-1 2019 |
Uncontrolled Keywords: | time for implementing the half slab method |
Subjects: | N Fine Arts > NA Architecture > NA7820 Hotels. Inns. Hotel lobbies For resorts T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction. T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Aping Nurfitri Rahma |
Date Deposited: | 30 Aug 2023 02:26 |
Last Modified: | 30 Aug 2023 02:26 |
URI: | http://repository.its.ac.id/id/eprint/65523 |
Actions (login required)
View Item |