Perencanaan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Pada Proyek Pembangunan Gedung Direktorat Reserse Kriminal Umum Polda Jawa Timur Dengan Metode Hazard And Operability Study (Hazop)

Ramadhan, Farhan Rizal (2023) Perencanaan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Pada Proyek Pembangunan Gedung Direktorat Reserse Kriminal Umum Polda Jawa Timur Dengan Metode Hazard And Operability Study (Hazop). Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910010024-Undergraduate_Thesis for D4 program.pdf] Text
10111910010024-Undergraduate_Thesis for D4 program.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (17MB) | Request a copy

Abstract

Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) merupakan pendekatan terstruktur yang digunakan oleh organisasi untuk mengelola risiko terkait dengan keselamatan dan kesehatan kerja. Pada proyek akhir ini penulis mengambil objek pembangunan gedung Ditreskrimum Polda Jatim, yang memiliki 8 lantai yang terletak di jalan Ahmad Yani Kota Surabaya. Berdasarkan Peraturan Menteri PUPR No. 10 tahun 2021 tentang Pedoman Sistem Manajemen K3, pada pembangunan gedung Ditreskrimum Polda Jatim tergolong kriteria proyek risiko keselamatan konstruksi tinggi, dengan nilai proyek 48 miliar 500 juta rupiah dan penulis menggunakan metode analisis HAZOP (Hazrd and Operability Study) untuk proses identifikasi bahaya, penilaian risiko dan pengendalian risiko. Metode tersebut bersifat fleksibel, merupakan salah satu metode yang proses analisis sangat terperinci dan menyeluruh, tidak hanya berfokus pada proses tetapi juga fokus pada operasionalnya. Bangunan gedung Ditreskrimum Polda Jatim akan ditinjau dari segi K3 konstruksi pada lantai 1 hingga 5, dan 6 hingga 8 untuk metode pelaksanaan pengecoran pada lantai 1 sampai 5 menggunakan concrete pump dan untuk lantai 6 hingga 8 menggunakan tower crane. Sehingga diperlukan identifikasi jenis-jenis kecelakaan kerja dan faktor-faktor penyebab kecelakaan dan keselamatan kerja. Identifikasi mengacu pada peraturan yang berlaku, salah satunya Peraturan Menteri No. 10 tahun 2021 tentang Sistem Manajemen K3. Untuk menghitung perencanaan anggaran biaya akan mengacu pada Surat Edaran Menteri PUPR No. 11/SE/M/2019 tentang Petunjuk Teknis Biaya Penyelenggaraan Sistem Manajemen Keseamatan Konstruksi. Pada proyek akhir ini menggunakan metode 2 metode pelaksanaan, yaitu concrete pump dan tower crane. Dari hasil analisa perencanaan ini terdapat 229 risiko bahaya pada lantai 1 sampai 5, untuk lantai 6 hingga 8 terdapat 244 risiko bahaya. Risiko bahaya terdiri dari kategori risiko bahaya rendah, sedang, tinggi dan ekstrim. Rencana Anggaran Biaya SMK3 proyek ini dibutuhkan sebesar Rp. 717,154,698 (Tujuh Ratus Tujuh Belas Juta Seratus Lima Puluh Empat Enam Ratus Sembilan Puluh Delapan Rupiah).
=================================================================================================================================
The Occupational Safety and Health Management System (SMK3) is a structured approach used by organizations to manage risks related to occupational safety and health. In this final project, the author takes the object of the construction of the East Java Regional Police Ditreskrimum building, which has 8 floors located on Jalan Ahmad Yani, Surabaya City. Based on PUPR Ministerial Regulation No. 10 of 2021 concerning Guidelines for the K3 Management System, the construction of the East Java Polda Ditreskrimum building is classified as a high construction safety risk project criterion, with a project value of 48 billion 500 million rupiah and the authors use the HAZOP (Hazrd and Operability Study) analysis method for the process of hazard identification, risk assessment and risk control. This method is flexible, is one of the methods with a very detailed and thorough analysis process, not only focusing on processes but also focusing on operations. The East Java Regional Police Ditreskrimum building will be reviewed in terms of K3 construction on floors 1 until 5, and 6 until 8 for the casting method on floors 1 to 5 using a concrete pump and for floors 6 to 8 using a tower crane. So it is necessary to identify the types of work accidents and the factors that cause accidents and work safety. Identification refers to applicable regulations, one of which is Ministerial Regulation No. 10 of 2021 concerning the K3 Management System. To calculate the cost budget planning will refer to the Minister of Public Works and Public Housing Circular Letter No. 11/SE/M/2019 concerning Technical Instructions for the Cost of Implementing a Construction Safety Management System. In this final project using 2 implementation methods, namely concrete pump and tower crane. From the results of this planning analysis there are 229 hazard risks on floors 1 to 5, for floors 6 to 8 there are 244 hazard risks. Hazard risk consists of low, medium, high and extreme hazard risk categories. The SMK3 Budget Plan for this project is needed in the amount of Rp. 717,154,698 (Seven Hundred Seventeen Million One Hundred Fifty-Four Six Hundred Ninety Eight Rupiah).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Bangunan Gedung, Perencanaan SMK3, HAZOP, RAB K3, Buildings, SMK3 Planning
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Farhan Rizal Ramadhan
Date Deposited: 08 Aug 2023 06:05
Last Modified: 08 Aug 2023 06:05
URI: http://repository.its.ac.id/id/eprint/103145

Actions (login required)

View Item View Item