Analisis Perbandingan Waktu dan Biaya Proyek Pembangunan Gedung Tower UNS 11 Lantai Surakarta Menggunakan Bekisting Plywood Polyfilm dan Perth Construction Hire (PCH) Dengan Bekisting Konvensional

Kurniawan, Yusuf Faisal Ardhi (2024) Analisis Perbandingan Waktu dan Biaya Proyek Pembangunan Gedung Tower UNS 11 Lantai Surakarta Menggunakan Bekisting Plywood Polyfilm dan Perth Construction Hire (PCH) Dengan Bekisting Konvensional. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035221110-Undergraduate_Thesis.pdf] Text
2035221110-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (31MB) | Request a copy

Abstract

Perhitungan waktu dan rencana anggaran biaya pelaksanaan pada proyek merupakan hal yang penting karena pada dasarnya keberhasilan suatu proyek dapat ditinjau dari ketepatan waktu dalam proses pelaksanaan serta keuntungan dalam biaya. Pemilihan material pada pekerjaan proyek sangat berpengaruh pada saat pelaksanaannya, terutama pada pemilihan jenis bekisting yang akan digunakan. Oleh karena itu, pada proyek tugas akhir ini Gedung Tower UNS 11 Lantai Surakarta akan dilakukan perhitungan kembali dengan menggunakan metode bekisting Plywood Polyfilm dan Perth Construction Hire (PCH).
Bekisting merupakan cetakan sementara untuk menahan beban selama beton dituang hingga beton mengeras. Bekisting polyfilm ini memiliki ukuran cukup besar dibandingkan dengan bekisting konvensional. Dari segi durasi produktivitas, kualitas dan penggunaan bekisting polyfilm merupakan bekisting yang efektif digunakan terutama pada proyek yang memiliki tipe lantai tipikal karena dapat digunakan berkali-kali dan biaya untuk tenaga kerja relatif lebih sedikit dibandingkan dengan bekisting konvensional. Perancah merupakan struktur sementara yang digunakan untuk menyangga manusia dan material dalam kegiatan konstruksi gedung maupun konstruksi lainnya. PCH merupakan metode perancah yang memiliki kelebihan yaitu pemasangannya lebih praktis sehingga menghemat waktu dan juga lebih rapi dibandingkan perancah scaffolding.
Penyusunan proyek akhir ini dimulai dari mengidentifikasi item pekerjaan kemudian menghitung volume dan produktivitas guna menyusun penjadwalan yang dibantu oleh aplikasi Microsoft Project. Didapatkan jumlah biaya pembangunan proyek Gedung Tower UNS 11 Lantai Surakarta dari kontraktor sebesar Rp.24.289.038.765,73 dan analisa biaya menggunakan bekisting konvensional sebesar Rp. 24.780.644.983 dengan durasi waktu 276 hari dan biaya menggunakan bekisting Plywood Polyfilm serta Perth Construction Hire (PCH) sebesar Rp. 26.368.439.988 dengan durasi waktu 259 hari.
==================================================================================================================================
Calculation of the time and budget plan for the implementation of the project is important because basically the success of a project can be seen from the timeliness in the implementation process as well as the advantages in costs. The choice of material for project work is very influential during its implementation, especially in the selection of the type of formwork to be used. Therefore, in this final project, Tower UNS 11 Surakarta Floor will be recalculated using the plywood polyfilm formwork method.
Formwork is a temporary mold to hold the load while the concrete is poured until the concrete hardens. This plywood polyfilm formwork has a fairly large size compared to conventional formwork. In terms of productivity duration, quality and usage, plywood polyfilm formwork is an effective formwork to be used especially for projects with typical floor types because it can be used many times and costs for labor are relatively lower compared to conventional formwork. Scaffolding is a temporary structure used to support people and materials in building construction and other construction activities. PCH is a scaffolding method that has the advantage that installation is more practical so it saves time and is also neater than scaffolding.
Preparing this final project starts from identifying work items then calculating volume and productivity to prepare a schedule assisted by the Microsoft Project application. Therefore, the total construction cost for the 11 floor UNS Surakarta Tower Building Project from the contractor was Rp. 24.289.038.765,73 and the cost analysis using conventional formwork was Rp. 24.780.644.983 with a duration of 276 days and a cost of using Plywood Polyfilm formwork and Perth Construction Hire (PCH) of Rp. 26.368.439.988 with a duration of 259 days.

Item Type: Thesis (Other)
Additional Information: RSIS 690.659 7 YUS a 2024
Uncontrolled Keywords: Perencanaan Waktu dan Biaya, Rencana Anggaran Pelaksanaan, Plywood Polyfilm, Perth Construction Hire (PCH), Kurva S. Keywords: Time and Cost Planning, Implementation Budget Plan, Plywood Polyfilm Formwork, Pire Construction Hire, S Curve.
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Yusuf Faisal Ardhi Kurniawan
Date Deposited: 09 Feb 2024 00:05
Last Modified: 18 Nov 2024 08:09
URI: http://repository.its.ac.id/id/eprint/106462

Actions (login required)

View Item View Item