Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pembangunan Jalan Tol Probolinggo - Banyuwangi Paket 2 STA 15+400 - STA 20+200 dan Simpang Susun Paiton

Putra, Joshua Juan Victorio (2024) Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pembangunan Jalan Tol Probolinggo - Banyuwangi Paket 2 STA 15+400 - STA 20+200 dan Simpang Susun Paiton. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201080-Undergraduate_Thesis.pdf] Text
2035201080-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (59MB) | Request a copy

Abstract

Sistem Manajemen Keselamatan Konstruksi merupakan pemenuhan terhadap Standar Keamanan, Keselamatan, Kesehatan, dan Keberlanjutan dengan menjamin keselamatan keteknikan konstruksi, keselamatan dan Kesehatan kerja, dan keselamatan public, Proyek Akhir yang dikerjakan memiliki judul “Perencanaan Sistem Manajemen Keselamatan Konstruksi (Smkk) Pembangunan Jalan Tol Probolinggo – Banyuwangi Paket 2 Sta 15+400 – Sta 20+200 dan Simpang Susun Paiton”. Pada Tugas Akhir ini bertujuan untuk merencanakan SMKK pada pekerjaan pembangunan struktur jalan STA 15+400 – STA 20+200 dan Pembangunan struktur jalan simpang susun Paiton STA 0+000 – STA 2+200 Proyek Jalan Tol Probolinggo – Banyuwangi paket 2 (Kraksaan – Paiton). Dalam mengidentifikasi bahaya, penilaian risiko dan pengendalian risiko yang merupakan poin penting dalam Perencanaan K3 kali ini penulis menggunakan metode HIRARC (Hazard Identification, Risk Assessment and Risk Control). Dalam menentukan tingkat risiko, penulis juga melakukan observasi langsung beserta wawancara dengan personil – personil yang bekerja di lapangan. Hasil dari identifikasi bahaya, penilaian dan pengendalian risiko diidentifikasi total terdapat 241 jumlah bahaya dimana diantaranya 47 bahaya rendah, 173 bahaya sedang, dan 21 bahaya tinggi. Pada perhitungan biaya diperlukan biaya untuk penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK) sebesar Rp. 8,889,852,770.05 dimana jumlah tersebut sebesar 1,1% dari kontrak proyek.
==================================================================================================================================
Occupational Health and Safety program is a compliance to Security, Safety, Health, and Sustainability Standards by ensuring the safety of construction engineering, occupational safety and health, and public safety. The Final Project carried out has the title " Design Of Occupational Health And Safety System Of Probolinggo – Banyuwangi Section 2 Highway Construction Project Sta 15+400 Sta 20+200 And Paiton Interchange” In this Final Project, it aims to plan OHS Plan on the construction of the STA 15+400 – STA 20+200 road structure and the construction of the Paiton Interchange STA 0+000 – STA 2+200 Probolinggo – Banyuwangi Toll Road Project section 2 (Kraksaan – Paiton). In identifying hazards, risk assessment and risk control which are important points in OHS Planning, the author uses the HIRARC method (Hazard Identification, Risk Assessment and Risk Control). In determining the level of risk, the author also made direct observations along with interviews with personnel working on site. It has been identified that there are 241 amount of hazards containing 47 low level hazards, 173 medium level hazards, and 21 high level hazards and for the safety budget counting it will need Rp. 8,889,852,770.05 which is 1,1% of the project total cost.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Metode HIRARC, Perencanaan SMKK, SMKK Jalan Tol, Highway OHS Planning, HIRARC Method, OHS Planning.
Subjects: T Technology > T Technology (General) > T55 Industrial Safety
T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
T Technology > TE Highway engineering. Roads and pavements > TE7 TG300 Bridges--Design and construction.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
T Technology > TH Building construction > TH900+ Construction equipment in building construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: joshua juan victorio putra
Date Deposited: 16 Aug 2024 02:51
Last Modified: 16 Aug 2024 03:05
URI: http://repository.its.ac.id/id/eprint/112711

Actions (login required)

View Item View Item