Optimasi Waktu dan Biaya (Time Cost Trade Off – TCTO) Menggunakan Paricle Swarm Optimization (PSO) Pada Proyek Pembangunan Jalur Ganda KA Lintas Selatan Jawa

Khabibulloh, Mohammad (2022) Optimasi Waktu dan Biaya (Time Cost Trade Off – TCTO) Menggunakan Paricle Swarm Optimization (PSO) Pada Proyek Pembangunan Jalur Ganda KA Lintas Selatan Jawa. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111840000076-Undregraduate_thesis.pdf] Text
03111840000076-Undregraduate_thesis.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy

Abstract

Pada Proyek Pembangunan Jalur Ganda Jalan Ka Lintas Selatan Jawa Km 49+500 Sd Km 52+500 Antara Mojokerto Solo (Paket JGMS-9) mengalami keterlambatan dikarenakan shopdrawing pengerjaan proyek belum disetujui. Akibat hal tersebut, perlu dilakukan optimasi percepatan waktu untuk mengejar keterlambatan dan mengestimasi pertambahan biayanya. Tugas akhir ini bertujuan untuk mereduksi keterlambatan penyelesaian proyek dengan mempercepat waktu penyelesaian proyek dan dengan biaya seminimal mungkin. Untuk mempercepat durasi proyek akan diterapkan metode Time Cost Trade Off (TCTO). Pada tugas akhir ini, data yang digunakan adalah data sekunder (Schedule, kurva S dan produktivitas pekerja) dan data primer. Optimasi metaheuristic, Particle Swarm Optimization (PSO), digunakan untuk mengoptimalkan pertukaran waktu dan biaya (Time Cost Trade off). algoritma dikerjakan menggunakan program bantu MatLab™. Tahapan penelitian dilakukan dengan menentukan objective function model PSO, men-generate particle dan menentukan velocity dari partikel. Simulasi dilakukan dengan melakukan 1000 kali iterasi. Untuk validasi model, dilakukan perhitungan TCTO secara matematis (manual) kemudian hasilnya dibandingkan dengan luaran PSO. Hasil penelitian menunjukkan bahwa, durasi normal pada pekerjaan jembatan adalah 302 hari dengan biaya normal sebesar Rp. 23.036.343.652. Durasi percepatan proyek setelah dilakukan analisa Time Cost Trade Off (TCTO) dengan menggunakan metode matematis adalah 287 hari dengan biaya percepatan Rp. 28.365.575.129. Durasi percepatan proyek setelah dilakukan analisa Time Cost Trade Off (TCTO) dengan menggunakan Particle Swarm Optimization (PSO) adalah 287 hari dengan biaya percepatan Rp. 28.464.546.260. Dari hasil tersebut terlihat bahwa hasil analisis matematis dan analisis metaheuristik memberikan hasil yang sama, dengan perbedaan 0.001%. Oleh karena itu, model PSO ini dapat diterapkan untuk mengoptimasi waktu dan biaya proyek.
================================================================================================================================
The Double Track Development Project for South Java Km 49+500 Km 52+500 Between Mojokerto Solo Road (JGMS-9) has experienced delays because shopdrawing for the project has not been approved. As a result of this, it is necessary to optimize the acceleration of time to catch up with delays and estimate the increase in costs. This final project aims to reduce project completion delays by accelerating project completion time and with minimal costs. To speed up the duration of the project, the Time Cost Trade Off (TCTO) method will be applied. In this final project, the data used are secondary data (Schedule, S curve and worker productivity) and primary data. A metaheuristic ptimization, Particle Swarm Optimization (PSO), is used to optimize the time and cost trade off (Time Cost Trade off). algorithms were worked out using the MathLab™ assistive program. The research stages are carried out by determining the objective function of the PSO model, generating particles and determining the velocity of the particles. The simulation is done by doing 1000 iterations. For model validation, the TCTO calculation is done mathematically (manually) then the results are compared with the PSO output. The results showed that, the normal duration of the bridge work is 302 days with a normal cost of Rp.23,036,343,652. The duration of the project acceleration after the Time Cost Trade Off (TCTO) analysis using the mathematical method is 287 days with an acceleration fee of Rp. 28,465,575,129. The duration of the project acceleration after the Time Cost Trade Off (TCTO) analysis using Particle Swarm Optimization (PSO) is 287 days with an acceleration cost of Rp. 28,464,546,260. From these results, it can be seen that the results of mathematical analysis and metaheuristic analysis give the same results, with a difference of 0.001%. Therefore, this PSO model can be applied to optimize project time and cost.

Item Type: Thesis (Other)
Uncontrolled Keywords: Optimasi, Percepatan, TCTO, PSO, Matlab, Algoritma, Optimization, Crashing, TCTO, PSO, Matlab, Algorithm
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 12 Jan 2026 08:47
Last Modified: 12 Jan 2026 08:47
URI: http://repository.its.ac.id/id/eprint/129517