Desain Struktur dan Metode Pelaksanaan Pelat Lantai Beton Prategang Pada Gedung Hotel Pesona Pekanbaru

., Yulistiawan (2017) Desain Struktur dan Metode Pelaksanaan Pelat Lantai Beton Prategang Pada Gedung Hotel Pesona Pekanbaru. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3116040521_Undergraduate_Theses.pdf]
Preview
Text
3116040521_Undergraduate_Theses.pdf - Published Version

Download (11MB) | Preview

Abstract

Hotel Pesonna Pekanbaru merupakan sebuah gedung Perhotelan yang terletak di Kota Pekanbaru Riau. Berdasarkan perhitungan analisa beban gempa, Kota Pekanbaru termasuk dalam kategori desain seismik D. Sehingga, gedung direncanakan dengan sistem rangka pemikul momen khusus (SRPMK). Gedung akan dirancang mempunyai dua lantai ballroom yang terdapat pada lantai sepuluh dan sebelas. Pada perancangan ballroom akan lebih membutuhkan luasan ruangan yang besar. Oleh karena itu lantai sebelas pada gedung ini akan di desain menggunakan pelat lantai beton prategang. Perhitungan struktur gedung dimulai dari pengumpulan data, preliminary desain, perhitungan pembebanan dan pemodelan struktrur. Pemodelan struktur pelat prategang dimodelkan terpisah karena pelat tidak monolit dengan struktur utama. hal ini dimaksudkan agar pada saat pemberian gaya prategang tidak mempengaruhi struktur utama. Kontrol analisa struktur terdiri dari kontrol gaya dalam dan kontrol dinamis. Desain pelat lantai prategang dengan tebal 250 mm menggunakan material beton mutu tinggi K-500 dan baja prategang 270 Kpsi. Tendon yang digunakan terdiri dari 5 strand 7 wire dengan angkur aktif dan angkur pasif. Pelat prategang menggunakan 32 angkur aktif dan pasif arah X dan 30 angkur aktif dan pasif arah Y. Gaya prategang yang diberikan pada satu tendon yaitu sebesar 1102.2 kN dengan kehilangan gaya prategang 17.7%. sistem pemberian gaya prategang menggukan sistem post –tension dengan dua tahap penarikan. Tahap pertama pemberian gaya prategang dilakukan pada saat umur beton 28 Mpa dengan gaya prategang 330.66 kN(30%) setelah dilakukan pengujian kuat tekan dilaboratorium dan tahap kedua setelah mutu beton mencapai kuat tekan rencana dengan gaya prategang 100%. Pelat prategang dengan luas 15.7 m x 14.9 m dapat dikerjakan dengan rencana anggaran biaya pelaksanaan sebesar Rp. 519.193.000. Dengan Lama Pelaksanaan 14 hari dan 1 hari pada hari ke 28, maka total pelaksanaan 15 hari kerja.
==============================================================================================
Pesona Pekanbaru hotel was a kind of hotel management which is located in pekanbaru Riau. Based on analysis of eartquake load pekanbaru city included in seismik design category D, so the building have planed by a special moment frame bear system. Building would be design with two ballroom that was on the ten and eleven floors at ballroom designing would need more wide room than in this building would be design by prestessed concrete slab. The calculation of building structure starts from data collection, preliminary design, load calculation and structural modeling.The modeling of prestressed slab structures is model separately because the slab are not monoliths with the main structure. It is intended that at time of giving the prestressing force does not affect the main structure.The structural analysis control consists of force control and dynamic control. Prestessed slab design with thickness 250 mm using concrete material hight quality K- 500 and prestessed steel 270 Kpsi. Tendon using 5 strand 7 wire with an active anchor type flat slab freyssinet. Prestressed slab using 32 an active anchor and passive X direction and 30 an active anchor and passive Y direction. Force prestessing which was given to one tendon as big as 1102.2 kN by losing force prestress 17.7 %. Pre-design force system using post system- tension with two steps pulling. The first step of giving prestressing was doing at the age of concrete 28 mpa with prestressed force 330.66 kN (30 %) after doing testing strong press in the laboratory and the second steps after the quality of concrete gain strong press plan with prestressed force 100%. Prestressed slab with broad 15.7 m x 14. 9 m can be done with a budget plan implementation costs as big as Rp. 519.193.000 with long implementation fourteen days and one day on twenty-eight days, then the total implementation of fifteen working days

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pelat Prategang, Desain Struktur, Metoda Pelaksanaan Pelat Prategang, Hotel Pesonna Pekanbaru.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Yulistiawa Yulistiawan Yulistiawan
Date Deposited: 06 Nov 2017 07:10
Last Modified: 05 Mar 2019 03:50
URI: http://repository.its.ac.id/id/eprint/42561

Actions (login required)

View Item View Item