Estimasi Risiko Proyek High Rise Building Pada Kontraktor

Imayanti, Basari (2017) Estimasi Risiko Proyek High Rise Building Pada Kontraktor. Masters thesis, ITS.

[thumbnail of Tesis Imayanti Basari.pdf]
Preview
Text
Tesis Imayanti Basari.pdf - Published Version

Download (2MB) | Preview
[thumbnail of 9112202822-Master_Thesis.pdf]
Preview
Text
9112202822-Master_Thesis.pdf - Published Version

Download (2MB) | Preview

Abstract

Semakin meningkatnya kebutuhan ruang dan terbatasnya lahan terutama di kota-kota besar menyebabkan banyaknya proyek-proyek gedung bertingkat (high rise building) di Indonesia. Proyek konstruksi termasuk proyek high rise building berada pada lingkungan yang kompleks dan dinamis sehingga menimbulkan ketidakpastian dan risiko tinggi. Resiko selalu ada dalam proyek konstruksi dan sering menyebabkan jadwal delay atau cost overrun. Manajemen risiko adalah proses yang terdiri dari identifikasi risiko, penilaian secara kualitatif dan kuantitatif, respon dengan metode penanganan dan pengendalian risiko yang sesuai. Konsep manajemen risiko menjadi sangat populer di sejumlah bisnis. Banyak perusahaan sering membuat prosedur manajemen risiko dalam proyek mereka untuk memperbaiki kinerja, meminimalkan kerugian dan meningkatkan keuntungan Risk event dari sebuah proyek berbeda berbeda dengan risk event pada proyek yang lain. Demikian juga tingkat kejadian dan dampak di setiap proyek selalu berubah-ubah dari proyek satu ke proyek yang lain. Ini menyulitkan manajemen untuk menangani risiko pada proyek-proyek barunya. Kurangnya manajemen risiko, bahkan analisis risiko tidak memadai, dapat menempatkan proyek konstruksi dalam bahaya.
Penelitian ini mencari alternatif untuk mendapatkan estimasi risk event, concequance atau dampak dan likelihood atau kemungkinan secara generik agar dapat digunakan untuk mengendalikan risiko proyek high rise building berikutnya. Penelitian ini melibatkan beberapa proyek high rise building yang akan digunakan sebagai dasar penetapan risk event, concequance atau dampak dan
likelihood atau kemungkinan. Dalam penelitian ini dipakai metode kualitatif, dan analisis data dilakukan dengan analisa nilai mean dengan mencari rata-rata dari data yang tersedia. Estimasi risiko ini bisa membantu kontraktor terutama di bidang high rise building untuk mengelola risiko baik dari faktor risiko, kemungkinan terjadinya (likelihood) dan dampak dari risiko (consequence).
============================================================ The increasing need for space and limited land especially in big cities cause many high rise building projects in Indonesia. Construction projects including high rise building projects are located in complex and dynamic environments result in high levels of uncertainty and risk. Risks are always present in construction projects and often lead to delay schedules or cost overruns. Risk management is a process consisting of risk identification, qualitative and quantitative assessment, response with appropriate methods of handling and risk control. The concept of risk management is becoming very popular in a number of
businesses. Many companies often create risk management procedures in their projects to improve performance, minimize losses and increase profits
Risk event from a different project is different from the risk event on another project. Likewise, the level of occurrence and impact in each project is
always changing from one project to another. This makes it difficult for management to handle risks on new projects. Lack of risk management, even
inadequate risk analysis, can put construction projects in jeopardy. This research looked for alternatives to get risk event, concequance or impact estimates and likelihood or generic possibilities in order to be u
sed to control the risk of subsequent high rise building projects. This research involves several high rise building projects that will be used as a basis for determining risk events, concequance or impact and likelihood or possibilities. In this study us
ed qualitative methods, and data analysis is done by
statistical analysis by finding the average of available data. Estimation this risk can help contractors, especially in the field of high rise building to manage risk both from risk factors, likelihood and consequence.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.155 Bas e
Uncontrolled Keywords: Risiko; risk event; kemungkinan; dampak; Risk; risk event;likelihood; consequence
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: 61101-Magister Management Technology
Depositing User: Basari Imajanti
Date Deposited: 10 Jan 2018 04:51
Last Modified: 05 Mar 2019 03:04
URI: http://repository.its.ac.id/id/eprint/48632

Actions (login required)

View Item View Item