Metode Pelaksanaan Bendungan Pengelak (Cofferdam) Bagian Hulu Pada Proyek Pembangunan Waduk Bendo, Ponorogo

Pratama, Bayu Putra and Tawakkal, Alfath (2018) Metode Pelaksanaan Bendungan Pengelak (Cofferdam) Bagian Hulu Pada Proyek Pembangunan Waduk Bendo, Ponorogo. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000109-10111500000110-Non_Degree.pdf]
Preview
Text
10111500000109-10111500000110-Non_Degree.pdf - Accepted Version

Download (9MB) | Preview

Abstract

Kabupaten Ponorogo terletak di Provinsi Jawa Timur, dengan ketinggian antara 92 sampai dengan 2.563 meter diatas permukaan laut, dan memiliki luas wilayah 1.371,78 km2. Meningkatnya perekonomian di Kabupaten Ponorogo mengakibat terpicunya pembangunan infrastruktur, salah satunya adalah pembangunan Waduk Bendo yang berfungsi untuk mengembangkan daerah Ponorogo yang berkaitan dengan pengembangan sumber daya air, guna memenuhi berbagai keperluan masyarakat seperti penyediaan air irigasi, air baku domestik dan industri serta pengendalian banjir.
Owner dari proyek Waduk Bendo Ponorogo ini adalah Kementrian PU Dirjen SDA BBWS Bengawan Solo. Pihak kontraktor dalam kegiatannya hanya mengandalkan gambar teknis dari owner dan dokumen metode pelaksanaan.
Bendung pengelak (cofferdam) terdiri dari beberapa pekerjaan yaitu pekerjaan pemetaan, pekerjaan cofferdam sementara (8643,92 m3), pekerjaan pembersihan (3600,06 m3), pekerjaan pengupasan (3600,06 m3), pekerjaan galian tanah (28369,13 m3), pekerjaan galian batu (66194 m3), pekerjaan cut off wall (150 m3), pekerjaan galian material timbunan, pekerjaan timbunan inti zona 1 (37660.66 m3), pekerjaan timbunan random zona 3 (49232,16 m3), pekerjaan timbunan batu zona 4 (99816 m3), pekerjaan timbunan rip-rap (13868,89 m3).
Pekerjaan cofferdam membutuhkan alat berat antara lain excavator, bulldozer, dumptruck, sheepfoot roller, vibrator roller, rig bore pile, watertank truck, motor grader, batching plan, dan mixer truck dan membutuhkan waktu pekerjaan selama 196.3 hari kerja.
=============================================================================================================
Ponorogo Regency is located in East Java Province, with an altitude of 92 to 2,563 meters above sea level, and has an area of 1,371.78 km2. The increasing of economy in Ponorogo regency is caused by the development of infrastructure, one of which is the development of Bendo Reservoir that serves to develop the Ponorogo area related to the development of water resources, to meet various needs of the community such as the provision of irrigation water, domestic and industrial water and the environment.
The owner of the Bendo Ponorogo Dam project is the Ministry of Public Works of the Director General of Natural Resources BBWS Bengawan Solo. Contractors in their activities rely solely on the technical drawings of owners and documents.
The Upstream Cofferdam construction works are divided into: Mapping (survey), Temporary Cofferdam (8643,92 m3), Clearing Jobs (3600,06 m3), Grubbing Jobs (3600,06 m3), Soil Excavation Work (28369,13 m3), Rock Excavation Work (66194 m3), Cut Off Wall Work (150 m3), Excavation Of Pile Material Work, Core Pile Work zone 1 (37660.66 m3), Random Pile Work zone 3 (49232,16 m3), Rock Pile zone 4 (99816 m3), Rip-Rap Pile Work Zone 5 (13868,89 m3).

The Upstream Cofferdam needs Heavy Equipment likes excavator, bulldozer, dumptruck, sheepfoot roller, vibrator roller, rig bore pile, watertank truck, motor grader, batching plan, dan mixer truck and takes work time over 196.3 work days.

Keyword : Working Method, Heavy Equiptment, Jobs Time.

Item Type: Thesis (Undergraduate)
Additional Information: RSIS 627.8 Pra m-1 3100018077320
Uncontrolled Keywords: Working Method, Heavy Equiptment, Jobs Time, Metode pelaksanaan, Alat berat, Durasi
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22001-(S3) PhD Thesis
Depositing User: Alfath Tawakkal
Date Deposited: 07 Feb 2019 02:58
Last Modified: 23 Oct 2020 06:33
URI: http://repository.its.ac.id/id/eprint/53560

Actions (login required)

View Item View Item