Hidayat, Moh Ardian (2018) Perhitungan Biaya dan Waktu Pelaksanaan Pembangunan Gedung Pascasarjana Universitas Muhammadiyah Malang (UMM). Undergraduate thesis, institut teknologi sepuluh nopember.
Preview |
Text
10111410000064-Undergraduated_Theses.pdf - Accepted Version Download (26MB) | Preview |
Abstract
Proyek akhir ini membahas perhitungan biaya dan waktu pelaksanaan pekerjaan struktur dengan objek pembangunan gedung Pascasarjana Universitas Muhammadiyah Malang (UMM) dari pondasi Borepile hingga lantai 7.
Perhitungan biaya dan waktu pelaksanaan menggunakan sumber refrensi utama dari buku Ir. A. Soedrajat s, Analisa (cara modern) Anggaran Biaya Pelaksanan, Penerbit “Nova”, Bandung dan refrensi tentang alat berat. Perhitungan volume pekerjaan dihitung berdasarkan gambar pelaksanaan yang ada dan berdasarkan analisa. Sedangakan untuk produktivitas dan kebutuhan sumber daya setiap pekerjaan dihitung berdasarkan refrensi yang digunakan sehingga didapatkan waktu dan biaya yang diperlukan dari pelaksanaan pembangunan pada objek studi.
Hasil durasi dan produktivitas tiap pekerjaan yang dihitung sebelumnya dapat dijadikan input pada aplikasi Software Ms.Project untuk membantudalam perencanaan penjadwalan pelakasanaan. Dari perencanaan yang sudah disusun didapatkan waktu pelaksanaan proyek adalah 132 hari dengan total biaya pelaksanaan yang dibutuhkan sebesar Rp. Rp.33.026.959.741
=
This final project discusses the calculation of the cost and time of execution of structural work with the object of building the Graduate Building of the University of Muhammadiyah Malang (UMM) from Borepile foundation up to 7th floor.
Calculation of cost and time of execution using the main reference from Ir. A. Soedrajat s, Analisa (cara modern) Anggaran Biaya Pelaksanaan, Penerbit "Nova", Bandung. And refrensi about heavy equipment. The calculation of the volume of work is calculated based on the existing implementation picture and based on the analysis. While for productivity and resource requirements each job is calculated based on the refrensi used so that the time and cost required from the implementation of development on the object of study.
The results of duration and productivity of each calculated work can be used as input in the Ms.Project Software application to assist in planning the scheduling. From the planning that has been prepared, the project implementation time is 132 days with the total cost of the required implementation of Rp. Rp.33.026.959.741
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSIS 690.831 Hid p-1 3100018076089 |
Uncontrolled Keywords: | penjadwalan pelaksanaan, waktu pelaksanaan, biaya pelasanaan, kurva S |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction > TH437 Building--Cost control. T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Moh Ardian Hidayat |
Date Deposited: | 08 Dec 2020 04:13 |
Last Modified: | 08 Dec 2020 04:13 |
URI: | http://repository.its.ac.id/id/eprint/56185 |