Analisis dan Perencanaan Pengembangan Sistem Distribusi Air Terhadap Pertumbuhan Proyek Pembangunan Apartemen Di Zona 2 PDAM Kota Surabaya

Nafisa, Nadia (2019) Analisis dan Perencanaan Pengembangan Sistem Distribusi Air Terhadap Pertumbuhan Proyek Pembangunan Apartemen Di Zona 2 PDAM Kota Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03211440000107-Undergraduate_Theses.pdf]
Preview
Text
03211440000107-Undergraduate_Theses.pdf

Download (3MB) | Preview

Abstract

Pada tahun 2017, di Zona 2 distribusi PDAM Kota Surabaya dengan air yang di-supply dari IPAM Ngagel I, Ngagel III dan Karang Pilang III PDAM Kota Surabaya telah mampu melayani 97% penduduk. Sesuai dengan RISPAM Tahun 2014-2035, per tahun 2018 sistem jaringan perpipaan yang ada diharapkan mampu melayani 100%. Permasalahan yang dialami PDAM Kota Surabaya ada pada jumlah penduduk yang terus bertambah dari tahun ke tahun, dibarengi dengan bermunculannya proyek pembangunan apartemen baru. Terdata sebanyak 41,57% pembangunan apartemen berada di Zona 2 dengan pertumbuhan 15.63% setiap tahunnya. Dibutuhkan analisis untuk mengetahui kondisi sistem distribusi eksisting dan merencanakan pengembangan untuk dapat melayani kebutuhan air penduduk.
Metode yang digunakan dalam perhitungan dan perencanaan sesuai dengan kriteria perencanaan, RTRW Kota Surabaya dan RISPAM Tahun 2014-2035 yang dikeluarkan oleh PDAM Kota Surabaya. Analisis dan permodelan dilakukan menggunakan aplikasi WaterCAD. Hasil analisis menunjukkan bahwa kurangnya aliran air yang sampai ke sambungan rumah pelanggan disebabkan oleh kurangnya tekanan pada sistem dan tingginya unit headloss pada pipa. Mengantisipasi hal tersebut, dilakukan program pengembangan untuk jangka waktu sepuluh tahun dan terbagi dalam dua tahap, Tahap I (2018-2022) dan Tahap II (2023-2027). Pengembangan diasumsikan akan didukung dengan supply air tambahan dari proyek SPAM Umbulan, pemanfaatan kapasitas idle IPAM Karang Pilang III, serta proyek pembangunan reservoir baru Karang Pilang IV pada tahun 2024.
Perencanaan pengembangan meliputi penambahan pipa distribusi secara paralel pada ruas pipa dengan nilai headloss yang tinggi dan pemaksimalan booster pompa yang ada. Rencana anggaran biaya untuk pengembangan PDAM Kota Surabaya sebesar Rp. 18,337,431,999.
================================================================================================
In 2017, the Zone 2 of PDAM Kota Surabaya with water supplied from IPAM Ngagel I, Ngagel III and Karang Pilang III PDAM Kota Surabaya has been able to serve 97% of the population. In accordance with RISPAM for 2014-2035, as of 2018 the existing pipeline network system is expected to be able to serve 100%. The problems experienced by PDAM Kota Surabaya are in the number of population which continues to increase from year to year, accompanied by the emergence of new apartment construction projects. As many as 41.57% of apartment construction is in Zone 2 with a growth of 15.63% annually. Analysis is needed to determine the condition of the existing distribution system and plan development to be able to service the water needs of the population.
The method used in the calculation and planning is in accordance with the planning criteria, Surabaya City RTRW and 2014-2035 RISPAM issued by PDAM Kota Surabaya. Analysis and modeling is done using the WaterCAD application. The results of the analysis show that the lack of water flow that reaches the customer's home connection is caused by the lack of pressure on the system and the high headloss unit on the pipe. Anticipating this, a development program was carried out for a period of ten years and was divided into two stages, Stage I (2018-2022) dan Stage II (2023-2027). Development is assumed to be supported by additional water supply from the Umbulan SPAM project, utilization of the IPAM Karang Pilang III idle capacity, and the new Karang Pilang IV reservoir development project in 2024.
Development planning involves adding a distribution pipe in parallel to the pipe section with a high headloss value and maximizing the existing pump booster. The budget plan for the development of PDAM Kota Surabaya is Rp. 18,337,431,999.

Item Type: Thesis (Undergraduate)
Additional Information: RSL 628.144 Naf a-1 2019
Uncontrolled Keywords: Distribusi Air, PDAM Kota Surabaya, Pertumbuhan apartemen, WaterCAD, Zona 2.Apartment project growth, PDAM Surabaya City, Water Distribution, Zone 2.
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems
Divisions: Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: Nadia Nafisa
Date Deposited: 08 Jul 2021 09:01
Last Modified: 08 Jul 2021 09:01
URI: http://repository.its.ac.id/id/eprint/60811