Perencanaan Perkuatan Timbuhan Tanah Pada Oprit Jembatan Sirnoboyo, Pacitan

Prambodo, Cholis Cahyo (2015) Perencanaan Perkuatan Timbuhan Tanah Pada Oprit Jembatan Sirnoboyo, Pacitan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3110100115-Undergraduate_Theses.pdf]
Preview
Text
3110100115-Undergraduate_Theses.pdf - Published Version

Download (4MB) | Preview
[thumbnail of 3110100115-paperpdf.pdf]
Preview
Text
3110100115-paperpdf.pdf - Published Version

Download (679kB) | Preview
[thumbnail of 3110100115-presentationpdf.pdf]
Preview
Text
3110100115-presentationpdf.pdf - Presentation

Download (532kB) | Preview

Abstract

Jawa Timur merupakan provinsi dengan tingkat
pertumbuhan ekonomi yang paling tinggi di Indonesia.Untuk
memaksimalkan pertumbuhan ekonomi perlu di bangun
infrastruktur yang mendukung kegiatan ekonomi. Pada jalur lintas
selatan telah dibuat jalur yang memenuhi standar, tetapi di daerah
Sirnoboyo masih terputus,karena belum dibangunnya jembatan.
Metode yang akan digunakan untuk melakukan
perencanaan oprit jembatan ini adalah Geotextillewall dan atau
menggunakan perkuatan sheet pile. Tetapi sebelum melakukan
perkuatan harus dilakukan analisa terlebih dahulu terhadap tanah
dasar dan timbunan yang akan direncanakan. Dalam perencanaan
Jembatan Sirnoboyo tersebut direncanakan menggunakan
timbunan oprit ± 8 meter agar elevasi tanah dasar sama dengan
elevasi pelat jembatan. Pada perencanaan timbunan oprit
jembatan, diperlukan dinding penahan tanah yang kuat untuk
menahan beban urugan oprit dan beban lalu lintas. Alternatif tipe
dinding penahan tanah yang digunakan adalah kombinasi sheet
iv
pile dengan geotextile, dan perkuatan tanah timbunan dengan
menggunakan geotextile.
Pada tipe timbunan trapesium, sistem perkuatan tanah
yang digunakan adalah menggunakan geotextile tipe UW-250
dengan kuat tarik maksimal sebesar 52 kN/m. Total biaya yang
dibutuhkan untuk perencanaan geotextile sebesar Rp
227.040.000,00
Dari hasil analisa perhitungan perencanaan ,
direncanakan kombinasi antara sheet pile dan geotextile dengan
tinggi konstruksi timbunan yang beragam. Tipe sheet pile yang
digunakan adalah W-325 A 1000 sedangkan tipe geotextile yang
digunakan adalah UW-250 dengan kuat tarik maksimal sebesar 52
kN/m. Total biaya yang dibutuhkan adalah Rp 3.183.590.000,00.
Selain itu juga merencanakan abutment dengan ketinggian 10,5
meter dan lebar 11,5 meter. dengan menggunakan tiang pancang
ang dipancang sedalam 16 meter dari permukaan tanah dan
berjumlah 15 buah. ========== East Java is the Province with the level of the highest
economic growth in Indonesia. To maximize the economic
growth needed in building infrastructure that supports
ecomnomic activity. at the traffic lane south have made path
that meet the standards, but in the area Sirnoboyo still
disconnected,because it has not built a bridge.
The method using for planning oprit this bridge is
geotextile wall and or using reinforcement sheetpile . but before
retrofitting should be analyzed prior to the subgrade and
embankment to be planned. In planning Sirnoboyo Bridge is
planned to use a heap oprit ± 8 meters order subgrade elevation
equal to the elevation of the bridge plate. In planning oprit
bridge piles. Needed a strong retaining wall to hold the load of
embankment and traffic load. Alternative types of retaining wall
used is combination of sheetpile with geotextile and soil
embankment reinforcement using geotextille .
In type trapezoidal embankment, soil reinforcement
system used is using geotextile type UW-250 with a maximum
tensile strength of 52 kN / m and mounted on each STA.
In type trapezoidal embankment, soil reinforcement
system used is using geotextile type UW-250 with a maximum
tensile strength of 52 kN / m and mounted on each STA. The
amount needed for planning geotextile Rp 227,040,000.00
From the analysis, planning calculations, the planned
combination of sheet pile and geotextile with diverse high
embankment construction. Type of sheet pile used is W-325 A
1000 and using geotextile UW-250 with a maximum tensile
strength of 52 kN / m. The amount needed is Rp
3,183,590,000.00. It is also planning abutment with a height of
10.5 meters and a width of 11.5 meter.dengan use dipancang
ang deep pile 16 meters from ground level and amounted to 15
pieces

Item Type: Thesis (Undergraduate)
Additional Information: RSS 624. 155 362 Pra p
Uncontrolled Keywords: Oprit, Sheet pile, Geotextile
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA455.S6 Soil (Materials of engineering and construction)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 28 Mar 2019 03:02
Last Modified: 28 Mar 2019 03:02
URI: http://repository.its.ac.id/id/eprint/62617

Actions (login required)

View Item View Item