Perencanaan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Pada Struktur Atas Pembangunan Gedung PT. Hutama Karya Office Di Jakarta Menggunakan Metode Hazard Identification Risk Assessment And Risk Control (HIRARC)

Noke, Kartika Dwi Puspa (2019) Perencanaan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Pada Struktur Atas Pembangunan Gedung PT. Hutama Karya Office Di Jakarta Menggunakan Metode Hazard Identification Risk Assessment And Risk Control (HIRARC). Diploma thesis, Intitut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000051_UNDERGRADUATE_THESIS.pdf]
Preview
Text
10111815000051_UNDERGRADUATE_THESIS.pdf

Download (34MB) | Preview

Abstract

Pada Tugas Akhir ini penulis mengambil objek pembangunan gedung PT. Hutama Karya Office Jakarta. Proyek pembangunan ini memiliki 3 basement dan 16 lantai termasuk rooftop. Pemilihan tema ini dimaksudkan agar dapat memahami serta membantu perusahaan dalam menyusun Sistem Manajemen K3 khususnya pada pekerjaan di ketinggian, agar kejadian yang tidak diinginkan atau yang dapat menimbulkan kerugian dapat dicegah. Bangunan gedung ini akan ditinjau dari aspek K3 pada lantai 4, 8 dan lantai 15. Dimana lantai 4 berada pada elevasi +15.00, lantai 8 berada pada elevasi 32.5 m dan lantai 15 berada pada elevasi 60.5 m. Selain menyusun Sistem Manajemen K3 juga direncanakan anggaran biaya K3 pada pembangunan gedung PT. Hutama Karya Office ini. Untuk teknik manajemen resiko yang terdiri dari identifikasi bahaya, penilaian resiko dan pengendalian resiko menggunakan metode HIRARC dan disesuaikan dengan PP No 50 Tahun 2012 dan Permen PU No 05 Tahun 2014, dan untuk perencanaan anggaran biaya K3 sendiri mengacu pada Surat Edaran Menteri PU No. 66 Tahun 2015 tentang perhitungan biaya K3. Hasil analisis resiko dengan menggunakan metode HIRARC terdapat 294 potensi bahaya yang teridentifikasi pada pembangunan lantai 4, lantai 8, dan lantai 15, 50 diantaranya tergolong bahaya risiko rendah, 172 risiko sedang, dan 72 bahaya tergolong berisiko tinggi. Sedangkan, niilai Biaya K3 untuk pembangunan struktur atas tersebut adalah sebesar Rp 1,763,188,000 =================================================================================================================================
This final project, the author takes the object of PT. Hutama Karya Office Jakarta. The development project has 3 basement and 16 floors including a rooftop. The choice of this theme is intended to be able to understand and assist the company in preparing the Occupational Safety and Health Management System (OSH), especially at work at height so that unwated events of those that can cause losses can be prevented. This building will be reviewed from the aspect of occupational safety amd healt on the 4th, 8th, and 15 floors. Where the 4th floor at +15.00 m, the 8th floor at +32.50 m and 15 floor is at +60.50 m. In addition, to compile the Occupational Safety and Health Management System
(OSH), the occupational safety and health cost budget is also planned for the construction of the PT. Hutama Karya Office. For the risk management techniques consisting of hazard identification, risk assessment and risk control using the HIRARC method and adjusted to PP No 50 Tahun 2012 and Permen No 05 Tahun 2014, and for the occupational safety and health cost budget planning refers to SE Permen No 66 Tahun 2015. The result of the risk analysis using the HIRARC method contained 294 potential hazard identified on the construction of the 4th, 8th, and 15 floors, 50 which were classified as low risks hazards, 172 medium risks, and 72 hazards classified as high risk. Meanwhile, the value of the occupational of the upper structure is Rp 1,763,188,000.

Item Type: Thesis (Diploma)
Additional Information: RSIS 620.86 Nok p-1 2019
Uncontrolled Keywords: Sistem Manajemen K3, Metode HIRARC, RAB K3
Subjects: L Education > L Education (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Kartika Dwi Puspa Noke
Date Deposited: 26 Apr 2024 01:36
Last Modified: 26 Apr 2024 01:36
URI: http://repository.its.ac.id/id/eprint/65116

Actions (login required)

View Item View Item