Rencana Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Gedung Pascasarjana UMM Malang

Rahmawati, Okta Lailia (2019) Rencana Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Gedung Pascasarjana UMM Malang. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000043-Undergraduate_Theses.pdf]
Preview
Text
10111815000043-Undergraduate_Theses.pdf

Download (24MB) | Preview

Abstract

Penyusunan tugas akhir yang berjudul Rencana Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Gedung Pascasarjana UMM ini menggunakan bangunan gedung Pascasarjana UMM, yang berada di Kota Malang. Proyek Gedung Pascasarjana UMM terdiri dari 9 lantai dan 1 lantai basement. Perhitungan biaya dan waktu pelaksanaan dihitung berdasarkan metode pelaksanaan yang digunakan sesuai dengan teori dan ilmu dari berbagai referensi yang disebutkan dalamkepustakaan serta dikaitkan dengan kondisi di lapangan. Sehingga dengan metode pelaksanaan yang tepat maka dihasilkan waktu dan biaya yang efektif. Sedangkan untuk penyusunan jadwal tiap item pekerjaan dilakukan dengan menggunakan bantuan software Microsoft Project dan Kurva S. Hasil akhir pada tugas akhir ini adalah rekapitulasi biaya pelaksanaan proyek, metode pelaksanaan yang digunakan, durasi pelaksanaan proyek, serta kurva S. Dari analisa, didapatkan durasi 362 hari kerja biaya pelaksanaan sebesar Rp. 36,251,795,602,-
=================================================================================================================================
The preparation of the final project entitled duration and cost calculation plan of building postgraduate umm malang uses the UMM Postgraduate building, which is located in Malang City. The UMM Postgraduate Building Project consists of 9 floors and 1 basement floor. This calculation of time and cost are based on implementation method which is according to various references and project conditions. So with the proper method, It will make an effective time and cost. Time scheduling is performed using Microsoft Project software and S curve. The final result of this final project are cost recapitulation, method that the wrtiter use, and also S curve. From the calculation of time and cost that has been done, obtained the duration of works for 362 on working days and costs Rp. 36,251,795,602.

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Rah r-1 2019
Uncontrolled Keywords: Cost and time of works, schedulinng, S curve
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Rahmawati Okta Lailia
Date Deposited: 21 Feb 2024 07:38
Last Modified: 21 Feb 2024 07:38
URI: http://repository.its.ac.id/id/eprint/65337