Optimasi Perencanaan Pengoperasian Waduk Bendo Ponorogo

Yusuf, Ahmad Tadia (2019) Optimasi Perencanaan Pengoperasian Waduk Bendo Ponorogo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111540000076-Undergraduate_Theses.pdf]
Preview
Text
03111540000076-Undergraduate_Theses.pdf

Download (5MB) | Preview

Abstract

Saat ini sedang berlangsung pembangunan Waduk Bendo Sawo. Waduk ini berada pada daerah perbukitan dengan elevasi bendungan + 151 m sebagai dasar sungai Nginden dan + 224 m pada puncaknya, serta memiliki daerah genangan seluas 192,214 km2, sehingga dapat menampung air sebesar 45,415 juta m3. Waduk ini digunakan untuk memenuhi kebutuhan irigasi, air baku domestik maupun non-domestik, serta kebutuhan air untuk pemeliharaan sungai. Suatu waduk idealnya harus dapat menyediakan air sesuai rencana, akan tetapi debit air yang terjadi di sungai tersebut tidak memungkinkan untuk menyuplai kebutuhan secara efektif bilamana tidak diatur pembagian airnya. Oleh karena itu diperlukan adanya suatu sistem pengoperasian waduk untuk mengatur pengeluaran debit air yang tersedia agar dapat digunakan secara efektif. Dalam upaya pengoptimalan pengoperasian ini diawali dengan pengumpulan data hidrologi, klimatologi, kontur area waduk, luas area irigasi, serta jumlah penduduk yang akan memanfaatkan air waduk. Selanjutnya dari data tersebut dapat dihitung ketersediaan dan kebutuhan airnya. Setelah itu aliran air masuk dan keluar setiap bulan dianalisis untuk nantinya disimulasikan pada kondisi kering, normal, maupun basah sesuai kebutuhan dan prioritas pembagiannya. Hasil dari rencana pengoperasian waduk ini adalah modifikasi area tanam yang awalnya 7800 ha menjadi 3900 ha serta pemilihan bulan dimulainya pengoperasian, yang mana bulan terbaik dimulainya pengoperasian waduk ini adalah bulan September.
================================================================================================================================
Bendo Sawo Reservoir is currently under construction. It located at the hills which has elevation + 150 m as a Nginden river ground and + 224 m on the summit. Moreover, it has inudation area of 192,214 km2. Therefore, it can hold 45,415 juta m3 of water. This reservoir is used to fulfill irrigation, domestik or non-domestic raw water, and river maintenance. The reservoir should ideally be able to provide water according to the plan, but the flow of water occurs in the river is not possible to supply the needs effectively. It will happen when the distribution of water is not regulated. As a result, it is needed an operation system of reservoir to set available water outflow, so that it can be used effectively.
In order to optimize this operation, it begins with collecting hydrological data, climatology, contour of reservoir area, irrigation area, and the number of residents who will use the reservoir water. Furthermore, from these data the water availability and needs can be calculated. After thar, water inflow and outflow each month will be analyzed to simulate on dry, normal, and wet condition according to the needs and the priority distribution.
The result of reservoir operation plan are to modify plantation area which has 7800 ha to become 3900 ha. In addition, selecting month of operational initiation, which is the best month to initiate the operation of reservoir occur on September.

Item Type: Thesis (Other)
Uncontrolled Keywords: Inflow, Outflow, Simulation, Reservoir, Bendo Ponorogo Reservoir
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Ahmad Tadia Yusuf
Date Deposited: 09 Jul 2024 03:14
Last Modified: 09 Jul 2024 03:14
URI: http://repository.its.ac.id/id/eprint/66034

Actions (login required)

View Item View Item