Analisis Operasi dan Pemeliharaan (OP) Untuk Meningkatkan Kinerja Sistem Drainase Pada Boezem Bratang Saluran Kali Sumo-Bratang, Kota Surabaya

Pratama, Bayu Putra (2019) Analisis Operasi dan Pemeliharaan (OP) Untuk Meningkatkan Kinerja Sistem Drainase Pada Boezem Bratang Saluran Kali Sumo-Bratang, Kota Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000060_Undergraduate_Theses.pdf]
Preview
Text
10111815000060_Undergraduate_Theses.pdf

Download (12MB) | Preview

Abstract

Berdasarkan topografi kota Surabaya, tidak semua limpasan air hujan dapat dialirkan secara gravitasi. Oleh karena itu pada beberapa kawasan diperlukan pompa banjir agar dapat mengalirkan limpasan air hujan. Salah satu diantaranya adalah DAS Kali Sumo-Bratang dengan luas DAS 339.46 ha atau 3.39 km2. Ini terdapat 6 unit pompa dengan kapasitas 1,5 m3/s 3 unit pompa dan 2 m3/s 3 unit pompa difungsikan untuk membuang air ke Kali Jagir Wonokromo. Kali Sumo juga terpengaruh aliran kali bokor dan DAS Kali Dami. Kinerja eksisting sistem drainase Kali Sumo sebesar 71% ditinjau dengan masih terjadinya banjir pada beberapa titik. Kurang optimalnya pengoperasian pompa banjir Bratang dan pendangkalan pada Boezem Bratang juga menjadi salah satu menurunnya kinerja sistem drainase. Untuk penigkatan kinerja sitem drainase Kali Sumo dan Boezem Bratang menjadi 100% dibutuhkan 6 pompa dengan kapasitas 1,5 m3/s 2 unit, 2 m3/s 4 unit dan dilakukan normalisasi Boezem Bratang sedalam 1 m menjadi EL. -0,59 m. Hasil yang didapat adalah banjir pada saluran Kali sumo dapat tereduksi sebesar 63% dari debit awal Q10 = 33.940 m3/s menjadi 21,320 m3/s yang membebani saluran Kali Sumo. Total rencana anggaran biaya untuk operasi dan pemeliharaan Boezem Bratang boezem Bratang sebesar Rp. 1,156,654,914,- per tahun.
=================================================================================================================================
Based on Surabaya's topography, not all rainwater can fully flow. Therefore in some areas, a flood pump is needed in order to drain rainwater runoff. One value is the Kali Sumo-Bratang watershed with a watershed area of 339.46 ha or 3.39 km2. These are 6 pump units with a capacity of 1.5 m3 / s 3 pump units and 2 m3 / s 3 pump units are used to remove air into Jagir Wonokromo River. Kali Sumo also approved the flow of the Kali Dami river and river basin. Kali Sumo's existing performance drainage system of 71% is still in need of flooding at some point. The less optimal Bratang flood booster pump and siltation in Boezem Bratang are also one of the declining ones in increasing the drainage system. To increase the performance of the Kali Sumo and Boezem Bratang drainage system to 100%, 6 pumps are needed with a capacity of 1.5 m3 / s 2 units, 2 m3 / s 4 units and normalization of Boezem Bratang is 1 m deep into EL. -0.59 m. The results obtained were floods when the Sumo channel could be reduced by 63% from the initial discharge Q10 = 33,940 m3 / s to 21,320 m3 / s which weighed on the Sumo Kali channel. The total budget plan for boezem Bratang operation and maintenance is Rp. 1,156,654,914,- per year.

Item Type: Thesis (Diploma)
Additional Information: RSIS 627.54 Pra a-1 2019
Uncontrolled Keywords: Sumo River, Operation and Maintenance, Boezem, Pump, Operating Costs
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TC Hydraulic engineering. Ocean engineering > TC424 Water levels
T Technology > TC Hydraulic engineering. Ocean engineering > TC530 Flood control
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: BAYU PUTRA PRATAMA
Date Deposited: 18 Mar 2024 07:18
Last Modified: 18 Mar 2024 07:18