Perencanaan Biaya dan Waktu pada Proyek Pembangunan Gedung Dewan Perwakilan Rakyat Daerah Kota Surabaya

Fabiolawati, Annisa Shabrina and Yuniar, Sabrina Alifiyah Nisa (2019) Perencanaan Biaya dan Waktu pada Proyek Pembangunan Gedung Dewan Perwakilan Rakyat Daerah Kota Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111600000079_10111600000096-Undergraduate_Thesis.pdf] Text
10111600000079_10111600000096-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (67MB) | Request a copy

Abstract

Proyek Pembangunan Gedung Dewan Perwakilan Rakyat Daerah Kota Surabaya ini dibangun 9 lantai termasuk 1 lantai basement dan 1 lantai atap dengan luas bangunan 5072 m2 yang berada di Jalan Yos Sudarso, Surabaya dengan konstruksi beton bertulang. Pada proyek pembangunan ini diperlukan perhitungan rencana anggaran biaya dan waktu untuk mengetahui seberapa besar biaya yang diperlukan dan bagaimana menghitung waktu pembangunan proyek tersebut. Untuk itu, tugas akhir ini menggunakan bangunan tersebut untuk merencanakan biaya dan waktu mulai dari lantai basement sampai lantai atap dengan bantuan alat berat. Dalam menghitung waktu dimulai dari kapasitas produksi, produktivitas, durasi, dan penyusunan jadwal setiap pekerjaan, dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project. Untuk perhitungan biaya menggunakan Harga Satuan Pokok Kegiatan (HSPK) Kota Surabaya 2018. Dan nilai referensi harga didapat dari Harga Satuan Dasar Surabaya. Berdasarkan hasil analisa diperoleh rencana anggaran biaya untuk pekerjaan struktur utama pada proyek ini sebesar Rp12.267.220.000 dan waktu pembangunan proyek adalah selama 138 hari.
===========================================================================================================================
Regional House of Representatives building project of Surabaya City was built 9 floors including basement floor and rooftop with an area of 5072 m2. It is located at Jalan Yos Sudarso, Surabaya, with reinforced concrete construction. This building project requires the calculation of the budget and execution time to determine the required cost and duration of the project implementation. For the calculation of time, the analysis starts from production capacity, productivity, duration, and scheduling of each job using Microsoft Project. For the calculation of the budget plan, the analysis is based on the standard price of HSPK Surabaya 2018. The price reference value is obtained from Surabaya Basic Unit Prices. Based on the results of the analysis, the implementation budget plan for the concrete structure in this project is Rp12.267.220.000, and the project development time is 138 working days.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Budget Plan Building Cost, Execution Building Time
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > 22401-Civil Infrastructure Engineering (D3)
Depositing User: Yuniar Sabrina Alifiyah Nisa
Date Deposited: 12 Aug 2026 06:22
Last Modified: 12 Aug 2026 06:22
URI: http://repository.its.ac.id/id/eprint/67675

Actions (login required)

View Item View Item