Estimasi Waktu Dan Biaya Pelaksanaan Proyek Pembangunan Jembatan Sungai Jambe Jalan Tol Cibitung - Cilincing STA 11+400 - STA 11+500

Nolasari, Annisa Binti (2020) Estimasi Waktu Dan Biaya Pelaksanaan Proyek Pembangunan Jembatan Sungai Jambe Jalan Tol Cibitung - Cilincing STA 11+400 - STA 11+500. Diploma thesis, Institut Teknologi Speuluh Nopember.

[thumbnail of 10111610013013-Undergraduate_Thesis.pdf]
Preview
Text
10111610013013-Undergraduate_Thesis.pdf

Download (38MB) | Preview

Abstract

Waktu dan biaya adalah dua hal yang krusial dalam pelaksanaan proyek konstruksi. Maka dari itu, proyek konstruksi yang baik adalah proyek yang mampu berjalan sesuai dengan perencanaan biaya dan waktu yang telah ditetapkan. Untuk mewujudkan hal tersebut, maka dalam suatu proyek dibutuhkan manajemen proyek yang baik karena manajemen proyek merupakan kegiatan merencanakan, mengorganisasikan, mengarahkan, dan mengendalikan sumberdaya organisasi perusahaan untuk mencapai tujuan tertentu dalam waktu tertentu dengan sumberdaya tertentu. Jembatan Sungai Jambe merupakan salah satu jembatan utama yang terdapat pada proyek jalan tol Cibitung – Cilincing seksi 1 yang merupakan proyek strategis nasional untuk mengurangi angka kemacetan di Jabodetabek. Jembatan ini membentang sepanjang 84 m dan terdiri atas empat pier yang tersambung oleh 14 buah balok girder pracetak pada setiap span. Di antara pier 1 dan pier 2 serta pier 3 dan pier 4, membentang balok girder sepanjang 16 m, sementara di antara pier 3 dan pier 4, membentang balok girder sepanjang 50 m. Balok-balok girder tersebut ditopang oleh pier head yang membentang di atas struktur kolom, pile cap, dan pondasi tiang pancang serta diperkuat dengan adanya sambungan diafragma yang melintang. Selain itu, pada lapisan tanah juga terdapat struktur turap beton. Struktur beton pada jembatan ini menggunakan metode beton pracetak dan beton ready-mix, sedangkan metode yang digunakan pada pengangkatan girder ialah menggunakan crawler crane. Pada laporan tugas akhir ini, didapatkan hasil analisa estimasi waktu dan biaya pada pembangunan Jembatan Sungai Jambe yaitu selama 173 hari kalender dengan biaya sebesar Rp59.294.080.098.

========================================================

Time and cost are two crucial things for implementing construction projects. Thus, conctruction project is considered as success if it is proceed as how the time and cost are planned. In order to achieve it, construction project will need a well-planned project management because project management itself has the meaning to plan, organise, direct, and control the project’s resources to gain goals in certain time. Sungai Jambe bridge is one of the main bridges in Cibitung – Cilincing toll road project which is one of the national strategic project that aims to reduce the congestion rate that is commonly happened around Jabodetabek. Sungai Jambe bridge has a 84 metres long span that consist of 4 piers. Piers are connected by 14 precast girder boxes on each span.16 metres long precast girder boxes are connecting pier 1 to pier 2 and pier 3 to pier 4 as well. Meanwhile pier 2 to pier 3 is connected by 50 metres long precast girder boxes. Girder boxes are supported by the pier heads structure which extend above the coloumn, pile cap, and spun pile foundation structure. They are also strengthened by the connections of diaphragms. Furthermore, concrete sheet piles are placed on the ground layer to protect the structure from the river. Concrete structures of this construction are adapting the ready-mix and precast concrete methods to reduce the time waste. Meanwhile the method of girder erection is by using crawler cranes. Analysis results of estimated time and cost of the constructions of Sungai Jambe bridge are obtained in this final project report. The time and cost needed to construct Sungai Jambe bridge are consecutively 173 days long and Rp59.294.080.098.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: manajemen konstruksi, jembatan, estimasi, waktu, biaya, construction management, bridge, estimation, time, cost
Subjects: T Technology > TG Bridge engineering
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Annisa Binti Nolasari
Date Deposited: 27 Aug 2020 07:17
Last Modified: 21 Dec 2023 08:12
URI: http://repository.its.ac.id/id/eprint/81101