Perancangan Manajemen Proyek Pembuatan Rotary Restraining Box yang meliputi Desain Detail, Fabrikasi, Instalasi, dan Commissioning untuk Rumah Potong Hewan Pemkab Tuban

Samino, Arche Dorea Eirene (2020) Perancangan Manajemen Proyek Pembuatan Rotary Restraining Box yang meliputi Desain Detail, Fabrikasi, Instalasi, dan Commissioning untuk Rumah Potong Hewan Pemkab Tuban. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02111640000060_Undergraduate_Theses.pdf]
Preview
Text
02111640000060_Undergraduate_Theses.pdf

Download (5MB) | Preview

Abstract

Dinas Peternakan Kabupaten Tuban berencana membangun sebuah Rumah Pemotongan Hewan Ruminansia Modern dan telah menunjuk kontraktor untuk membuat Rotary Restraining Box sebanyak 2 unit dengan total anggaran dana sebesar Rp 300.000.000,- serta batas waktu pengerjaan selama 2 bulan. Permasalahannya, kontraktor yang ditunjuk dalam proyek ini tidak diberi spesifikasi alat oleh pihak Dinas Peternakan Tuban dan hanya diberi video alat tersebut.
Pada tugas akhir ini dilakukan perancangan manajemen proyek pembuatan Rotary Restraining Box yang meliputi pembuatan detail desain, fabrikasi, instalasi dan commissioning agar proyek dapat diselesaikan tepat waktu, tepat biaya, efektif dan sesuai dengan permintaan. Tahap pertama dilakukan pengumpulan dan pengolahan data untuk melakukan pembuatan desain detail, pembuatan bill of quantity, proyek, perkiraan biaya awal dan data produktivitas tenaga kerja. Kemudian dalam merancang manajemen proyek pembuatan rotary restraining box akan dilakukan pembuatan work breakdown structure (WBS) dengan menguraikan setiap pekerjaan yang dibutuhkan, dan dilanjutkan dengan perencanaan fabrikasi, instalasi serta commissioning pada proyek ini. Tahap selanjutnya dilakukan estimasi durasi waktu dan menentukan sumber daya yang dibutuhkan, scheduling proyek serta total biaya dan total waktu proyek secara keseluruhan software Microsoft Project digunakan sebagai alat bantu dalam perancangan manajemen proyek ini agar dapat dilakukan pengalokasian sumber daya, pengaturan jadwal kerja yang optimal dan pembagian kerja yang merata.
Dari perancangan ini, proses pembuatan 2 unit rotary restraining box direncanakan akan selesai dalam 37 hari dengan nilai total anggaran proyek dari perusahaan sebesar Rp 300.000.000,-. Kontraktor akan memperoleh proyeksi keuntungan sebesar Rp 93.161.170,-, dimana target profit 30 % dari nilai proyek akan berhasil dicapai.

=====================================================

Dinas Peternakan Kabupaten Tuban plans to build a Modern Ruminant Animal Slaughterhouse (RPH-R) and has appointed a contractor to make 2 units of Rotary Restraining Boxes with a total budget of Rp 300,000,000 and a processing time limit of 2 months. The problem is, the contractor in this project was only given a video of the machine, without specifications, by Dinas Peternakan Tuban.
In this final project, a project management design for the manufacture of a Rotary Restraining Box is carried out which includes detailed design, fabrication, installation and commissioning so that the project can be completed on time, on cost, effectively and according to demand. The first stage is collecting and processing data to make detailed designs, project’s bill of quantity, initial cost estimates and labor productivity data. Then in designing the project management for the manufacture of a rotary restraining box, a work breakdown structure (WBS) will be made by describing each work needed, and followed by planning for fabrication, installation and commissioning of this project. The next stage is to estimate the duration of time and determine the required resources, project scheduling as well as the total cost and total time of the project as a whole. Microsoft Project software is used as a tool in designing project management in order to allocate resources, arrange optimal work schedules and share work evenly.
From this design, the process of making 2 units of rotary restraining boxes is planned to be completed in 37 days with a total project budget value of Rp. 300,000,000. The contractor will receive a projected profit of Rp. 93,161,170, - in which a profit target of 30% of the project value will be achieved.

Item Type: Thesis (Other)
Uncontrolled Keywords: manajemen proyek, work breakdown structure, waktu, sumber daya, biaya
Subjects: A General Works > AC Collections. Series. Collected works
A General Works > AC Collections. Series. Collected works
T Technology > T Technology (General) > T56.8 Project Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures > TS155 Production control. Production planning. Production management
T Technology > TS Manufactures > TS157.5 Production scheduling
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: ARCHE DOREA EIRENE SAMINO
Date Deposited: 31 Aug 2020 02:42
Last Modified: 18 Jun 2023 14:14
URI: http://repository.its.ac.id/id/eprint/81658

Actions (login required)

View Item View Item