Metode beton pracetak merupakan metode yang
digunakan dalam perancangan bangunan disamping metode
konvensional dengan cara cor ditempat. Seiring dengan
perkembangannya, metode beton pracetak kini semakin banyak
diaplikasikan dalam pembangunan bangunan seperti pada
gedung, jembatan, maupun konstruksi lainnya. Penggunaan
metode beton pracetak didasari pada beberapa keungggulan
yang dimilikinya dibandingkan metode konvensional (cor
ditempat). Dalam pelaksanaannya metode beton pracetak
memiliki keunggulan dalam kecepatan pengerjaan dan kontrol
kualitas beton itu sendiri.
Perencanaan Gedung Skyloft SOHO apartement Ciputra
World Surabaya pada kondisi sebenarnya dirancang
menggunakan metode konvensional (cor ditempat). Gedung ini
memiliki dua puluh Sembilan lantai termasuk lantai atap dan
difungsikan sebagai gedung apartement. Dalam tugas akhir ini,
gedung tersebut akan dilakukan perancangan ulang
menggunakan metode beton pracetak. Pemilihan metode pracetak
didasari oleh kecepatan pelaksanaan , kontrol kualitas mutu yang
tinggi, ramah lingkungan, serta pengurangan jumlah tenaga
kerja.. Perencanaan yang dilakukan disini meliputi perencanaan
ii
pelat lantai, tangga, atap beton, balok anak, balok induk, kolom
dan pondasi. Komponen yang direncanakan menggunakan
metode beton pracetak adalah pada perencanaan pelat, balok
anak, dan balok induk. Sementara untuk kolom dan komponen
lainnya direncanakan dengan metode konvensional (cor
ditempat). Metode konvensional juga diterapkan pada
sambungan, yaitu sambungan antara pelat dengan balok, balok
dengan kolom, dan sambungan lainya direncanakan
menggunakan sambungan basah dengan cor di tempat.
Gedung apartemen ini juga direncanakan dengan
menggunakan Sistem Rangka Gedung (Building Frame System).
Dengan penggunaan sistem rangka gedung, beban gravitasi akan
diterima oleh rangka sementara beban lateral yang berupa beban
angin dan beban gempa diterima oleh dinding geser (Shearwall).
Tujuan dari Tugas akhir ini adalah menghasilkan
perencanaan struktur gedung dengan metode pracetak yang
benar dengan memenuhi persyaratan keamanan struktur
berdasarkan SNI 03-2847-2013, SNI 03-1727- 201x, SNI 03
1726-2012, dan PPIUG 1983. Dengan acuan tersebut diharapkan
gedung yang direncanakan mampu menerima gaya gravitasi
serta gaya lateral sehingga gedung dapat berfungsi sebagai
mana mestinya dan juga dapat mensosialisasikan kepada
masyarakat umum terkait tata cara penggunaan peraturan baru
tersebut.
============================================================================================================
Precast concrete method is the method used in the design
of the building in addition to the conventional method by means
of cast in place. Along with its development, precast concrete
methods are more and more applied in the construction of
buildings such as buildings, bridges, and other construction. The
use of precast concrete method is based on some of its good think
than conventional methods (cast in place). In precast concrete
implementation method has advantages in processing speed and
quality control of concrete itself.
Planning Skyloft SOHO apartment building Ciputra
World Surabaya on actual conditions designed using
conventional methods (cast in place). This building has twenty-
nine floors including roof and floor functioned as an apartment
building. In this thesis, the building will be re-design using
precast concrete method. The selection method is based on the
speed of execution of precast, quality control high quality,
environmentally friendly, as well as reducing the amount of labor
employed here .. Planning includes planning of the floor slabs,
stairs, concrete roofing, joists, beam, columns and foundations.
Components of the planned use of precast concrete method is in
the planning plate, joist and beam. As for columns and other
components are planned with conventional methods (cast in
iv
place). The conventional method is also applied to the
connection, ie the connection between the plates of the beam, the
beam with the column, and the other connection is planned to use
a wet connection with the cast in place.
The apartment building is also planned to use the System
Frame Building (Building Frame System). With the use of the
building frame system, gravity loads will be accepted by the order
while the lateral load in the form of wind loads and seismic loads
received by the shear wall (Shearwall).
The purpose of this final project is to produce structural
design of precast building with the correct method to meet the
security requirements of the structure by SNI 03-2847-2013, SNI
03-1727 - 201x, ISO 03, 1726-2012, and PPIUG 1983. With
reference to the expected building which is planned to receive the
force of gravity and lateral forces so that the building can
function as it should and can also disseminate to the general
public related to procedures for the use of the new regulations.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSS 690.831 4 Set p 3100014055806 |
Uncontrolled Keywords: | pracetak, metode konvensional, sambungan basah, Sistem Rangka Gedung. |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD1391 Apartment houses |
Depositing User: | Yeni Anita Gonti |
Date Deposited: | 06 Oct 2020 08:21 |
Last Modified: | 06 Oct 2020 08:21 |
URI: | http://repository.its.ac.id/id/eprint/82088 |
Actions (login required)
View Item |