Analisa Sistem Drainase Saluran Tol Waru- Juanda Akibat Pembangunan Surabaya Carnival & Night Market

., Anhar (2014) Analisa Sistem Drainase Saluran Tol Waru- Juanda Akibat Pembangunan Surabaya Carnival & Night Market. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3112105059-Undergraduate_Thesis.pdf]
Preview
Text
3112105059-Undergraduate_Thesis.pdf - Accepted Version

Download (5MB) | Preview

Abstract

Rencana pembangunan Surabaya Carnival & Night Market
dengan luas area 76.824,35 m2

, merupakan salah satu bentuk dari
lajunya pertumbuhan ekonomi di Kota Surabaya. Dengan adanya
pembangunan ini akan mengakibatkan meningkatnya limpasan air
disekitar kawasan. Sehingga diperlukan perencanaan drainase yang
ramah lingkungan, yaitu dengan konsep menampung limpasan air dan
mengatur pembuangannya. Dengan demikian, direncanakan operasional
dari kolam tampung untuk menerapkan PP No.26 Tahun 2008 tentang
Zero Delta Q.
Metode yang dilakukan adalah dengan merencanakan drainase
di bawah permukaan (subsurface drainage) yang tersambung ke saluran
didalam kawasan. Untuk saluran drainase dalam kawasan yang
berfungsi ganda sebagai tampungan sementara dan tersambung langsung
kedalam kolam tampungan. Sehingga volume limpasan air hujan dapat
ditampung di saluran dan kolam tampungan.
Air hujan yang turun didalam kawasan direncanakan untuk
dialirkan melalui pipa drain dan saluran menuju ke kolam tampungan.
Kolam tampung menerima volume limpasan dari 2 outlet/saluran
primer, dengan nilai masing-masing debit adalah 0,353 m
3
/dt dan 0,174

m
3
/dt. Sedangkan debit buangan yang diijinkan sebesar 0,227 m
3
/dt,
sehingga dilakukan operasional dari pompa dan pintu air untuk
mengatur volume buangan yang keluar menuju ke saluran pembuang.
============================================================================================================
Development plan of Surabaya Carnival & Night Market
within an area of 76824.35 m2

, is one of the quick of economic
growth in the city of Surabaya. This development will result in
increased water runoff around the area. So that the necessary
planning an environmentally friendly drainage, with concept holds
water runoff and arrange the disposal. So, from the operational of
storage ponds to implementing regulation No.26 years of 2008 about
The Zero of Delta Q.
The method is carried out by plotting the subsurface
drainage are connected to the channels in the region. For drainage
channels in the area that doubles as a temporary bin and connected
directly into the storage ponds. So that the volume of water runoff
can be accommodated in the channel and storage ponds.
Rain in the area is planned to be piped drain and the channel
leading to the storage ponds. Ponds receives runoff volume from 2
primary channel, with the value of each discharge is 0,353 m3
/sec

and 0,174 m3

/sec. While the allowable effluent discharge

0,227m3
/sec, so do the operation of pumps and sluice gates to
regulate the volume of effluent out into the exhaust duct.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 627.54 Anh a 3100014057640
Uncontrolled Keywords: Surabaya Carnival Night Market, Subsurface Drainage, Sistem Drainase, Kolam Tampung, Surabaya.
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE215 Drainage
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Yeni Anita Gonti
Date Deposited: 04 Nov 2020 02:49
Last Modified: 04 Nov 2020 02:49
URI: http://repository.its.ac.id/id/eprint/82224

Actions (login required)

View Item View Item