Analisa Proses Dan Rancangan Indikator Kinerja Supply Chain Pada Perusahaan Jasa Konstruksi

Esfandiatri, Yang Gisella Yulialistikas (2000) Analisa Proses Dan Rancangan Indikator Kinerja Supply Chain Pada Perusahaan Jasa Konstruksi. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211850086021-Master_Thesis.pdf]
Preview
Text
09211850086021-Master_Thesis.pdf

Download (2MB) | Preview

Abstract

Penelitian ini bertujuan untuk menganalisis proses dan mengukur kinerja rantai suplai pada industri konstruksi. Studi ini mengambil masalah pada rantai suplai konstruksi di sebuah perusahaan konstruksi besar di Indonesia. Pengukuran kinerja rantai suplai dilakukan dengan menggunakan Model Supply Chain Operation Reference (SCOR). Kami melakukan pengukuran kinerja pada lebih dari 40 proyek konstruksi yang ditangani oleh perusahaan saat ini. Pengukuran kinerja perusahaan akan dibandingkan dengan target yang dicapai. Hasil penelitian menunjukkan adanya gap rata-rata 21 % sampai dengan 26%. Ini berarti bahwa rantai suplai perusahaan perlu adanya perbaikan kinerja agar diperoleh hasil sesuai dengan target yang direncanakan. Hasil akhir penelitian ditetapkan strategi dan prinsip-prinsip Supply Chain Management perusahaan jasa konstruksi antara lain Supply Chain Management akan melayani dan mendukung secara total pertumbuhan bisnis perusahaan, proses pengadaan barang dan jasa harus lebih efektif dan efisien, sinergi dan hubungan yang terbaik dengan para rekanan, menerapkan proses bisnis supply chain management dalam digital atau elektronik, peningkatan kinerja personil SCM yang kompeten, berdedikasi dan berintegritas tinggi dalam proses bisnis Supply Chain Management mendatang.
======================================================================================================
This research aims to analyze the process and measure the performance of the construction services industry. This study takes the problem of construction supply chain in a major construction company in Indonesia. Supply chain performance measurement is carried out using the Supply Chain Operation Reference (SCOR) Model. We developed performance metrics and measure the performance of over 40 construction projects handled by this company. The performance we compared against the target. The results show that the gap in the rage of 21% to 26%. The general recommendation were to institutionalize supply chain management principles in the construction services to support business growth that include more effective dan efficient procurement process, improve synergy with business partners, SCM digital transformation, SCM talents competency coaching to support future supply chain management business processes.

Keywords: construction industry, performance measurement, SCOR Model, gap, performance improvement.

Item Type: Thesis (Masters)
Uncontrolled Keywords: industri konstruksi, pengukuran kinerja, Model SCOR, gap, perbaikan kinerja.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Business logistics--Cost effectiveness. Supply chain management. ERP
H Social Sciences > HF Commerce > HF5549.5.P35 Performance standards
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: Yang Gisella Yulialistika Esfandiatri
Date Deposited: 20 Jan 2021 07:41
Last Modified: 06 Apr 2023 06:41
URI: http://repository.its.ac.id/id/eprint/82544

Actions (login required)

View Item View Item