Maemunah, Nadia Siti (2021) Metode Pelaksanaan Serta Perhitungan Waktu Dan Biaya Pada Proyek Hotel Premier Inn Surabaya Dengan Menggunakan Aluminium Formwork. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
10111710010070_Undergraduate Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (29MB) | Request a copy |
Abstract
Proyek konstruksi merupakan suatu kegiatan yang berlangsung dalam jangka waktu terbatas dengan sumber daya yang beragam. Oleh karena itu, pengerjaan proyek membutuhkan manajemen konstruksi untuk membantu pengaturan sumber daya yang efektif dan efisien.
Proyek akhir ini merencanakan manajemen konstruksi pada Proyek Pembangunan Hotel Premiere Inn yang terletak di Jl. Biliton 24-26 Surabaya. Proyek akhir ini merencanakan pekerjaan struktur 9 lantai hunian menggunakan aluminium formwork mulai dari lantai 2 sampai dengan lantai 9. Hal tersebut dilakukan karena proyek memiliki lantai tipikal serta dapat mempercepat pekerjaan struktur.
Penyusunan proyek akhir dimulai dari mengidentifikasi item pekerjaan kemudian menghitung volume dan produktivitas. Perhitungan tersebut akan menentukan durasi item pekerjaan yang selanjutnya digunakan untuk menyusun penjadwalan. Penjadwalan dengan mengaplikasikan program bantu Microsoft Project. Hasil analisa perhitungan waktu diperoleh selama 118 hari kerja dan biaya pelaksanaan sebesar Rp5.926.280.166,40
====================================================================================================
A construction project is an activity that takes place in a limited period of time with various resources. Therefore, project work requires construction management to help manage resources effectively and efficiently.
This final project plans construction management at Hotel Premiere Inn Project which is located on Jl. Billiton 24-26 Surabaya. This final project plans to structure work 9 floor of recidence aluminum formwork starting from the 2nd floor to the 9th floor. This is done because the project has a typical floor and can speed up structural work.
The preparation of the final project starts from identifying the work items then calculating the volume and productivity. The calculation will determine the duration of the work item which is then used to arrange the schedule. Scheduling by applying the Microsoft Project. The results of the time calculation analysis is obtained for 118 working days and the implementation cost of Rp5.926.280.166,40
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Aluminium formwork, waktu pelaksanaan, anggaran biaya pelaksanaan, Miscrosoft Project. ==================================================================================================================== Aluminium formwork, implementation time, implementation cost budget, Miscrosoft Project. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | NADIA SITI MAEMUNAH |
Date Deposited: | 30 Aug 2021 14:21 |
Last Modified: | 30 Aug 2021 14:21 |
URI: | http://repository.its.ac.id/id/eprint/90829 |