Pengamatan Metode Pelaksanaan Pekerjaan Jembatan Pada Proyek Pembangunan Jalan Baru Planjan-Baron-Tepus Gunung Kidul, D.I. Yogyakarta

Asyhab, Sulthon Haidar (2022) Pengamatan Metode Pelaksanaan Pekerjaan Jembatan Pada Proyek Pembangunan Jalan Baru Planjan-Baron-Tepus Gunung Kidul, D.I. Yogyakarta. Project Report. [s.n], [s.l.]. (Unpublished)

[thumbnail of 03111840000127-Project_Report.pdf]
Preview
Text
03111840000127-Project_Report.pdf - Accepted Version

Download (5MB) | Preview

Abstract

Kerja praktik merupakan kegiatan yang dilakukan oleh mahasiswa/i pada suatu proyek berupa penerapan kompetensi yang telah didapatkan selama masa kuliah. Kerja praktik termasuk pada salah satu mata kuliah yang terdapat pada Institut Teknologi Sepuluh Nopember Surabaya. Kegiatan kerja praktik ini terletak pada Gunung Kidul, D.I. Yogyakarta yang mana proyek ini bernama Pembangunan Jalan Baru Planjan-Baron-Tepus (SBSN MYC). Proyek ini dikerjakan oleh PT. Adhi Karya (Persero) Tbk.
Jalan merupakan suatu prasarana transportasi yang menghubungkan satu wilayah dengan wilayah yang lainnya dan termasuk juga pada bagian bangunan pelengkapnya. Jembatan merupakan salah satu bagian dari bangunan pelengkap dari pembangunan jalan. Laporan kerja praktik ini berisi tentang pekerjaan jembatan pada Proyek Pembangunan Jalan Baru Planjan-Baron-Tepus, selain itu juga terdapat peralatan kebutuhan dalam pemenuhan Keselamatan dan Kesehatan Kerja (K3).
=====================================================================================================
Practical work is an activity carried out by students on a project in the form of applying the competencies that have been obtained during the lecture period. Practical work is included in one of the courses at the Sepuluh Nopember Institute of Technology, Surabaya. This practical work activity is located in Gunung Kidul, D.I. Yogyakarta, where the project is called the New Planjan-Baron-Tepus Road Development (SBSN MYC). This project is carried out by PT. Adhi Karya (Persero) Tbk. The road is a transportation infrastructure that connects one area to another and is also included in the complementary building. The bridge is one part of the complementary building of the road construction. This practical work report contains bridge work on the Planjan-Baron-Tepus New Road Construction Project, besides that there are also equipment needed to fulfill Occupational Safety and Health (K3).

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Kerja Praktik, Metode Pelaksanaan, Jembatan, Keselamatan dan Kesehatan Kerja, Practical Work, Implementation Methods, Bridges, Occupational Safety and Health
Subjects: T Technology > TG Bridge engineering > TG362 Box girder bridges--Design and construction.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Sulthon Haidar Asyhab
Date Deposited: 20 Jan 2022 14:14
Last Modified: 20 Jan 2022 14:14
URI: http://repository.its.ac.id/id/eprint/92441

Actions (login required)

View Item View Item