Analisis Faktor Utama Yang Mempengaruhi Waktu Pelaksanaan Proyek Pembangunan Infrastruktur LRT (Light Rail Transit) Jabodebek

Faisal, Fahmi (2017) Analisis Faktor Utama Yang Mempengaruhi Waktu Pelaksanaan Proyek Pembangunan Infrastruktur LRT (Light Rail Transit) Jabodebek. Masters thesis, ITS.

[thumbnail of Tesis Faisal Fahmi.pdf]
Preview
Text
Tesis Faisal Fahmi.pdf - Published Version

Download (890kB) | Preview
[thumbnail of 9112202816-Master_Theses.pdf]
Preview
Text
9112202816-Master_Theses.pdf - Published Version

Download (667kB) | Preview

Abstract

Light Rail Transit Jakarta Bogor Depok Bekasi atau disingkat LRT Jabodebek adalah sebuah sistem Mass Transit dengan kereta api ringan (LRT) yang direncanakan akan dibangun di Jakarta, Indonesia dan menghubungkan Jakarta
dengan kota-kota disekitarnya seperti Bekasi dan Bogor. Salah satu masalah terpenting dalam pembangunan LRT Jabodebek ini adalah keterlambatan waktu
pelaksanaan (delay). Penelitian ini bertujuan untuk mengetahui faktor yang mempunyai
pengaruh signifikan terhadap waktu pelaksanaan pekerjaan proyek LRT Jabodebek.
Metode penelitian yang digunakan pada penelitian ini adalah metode deskriptif.
Instrumen yang digunakan dalam pengumpulan data melalui teknik kuesioner
(angket
). Penelitian ini akan membahas tentang penerapan metode TOPSIS dalam
mengklasifikasikan faktor mana yang paling signifikan terhadap waktu pelaksanaan
konstruksi LRT Jabodebek. Pembobotan kriteria dan perangkingannya
menggunakan TOPSIS.
Hasil penelitian ini menunjukkan bahwa aspek serah terima lahan
merupakan ranking pertama yang harus diperhatikan sebagai faktor utama
penyebab keterlambatan proyek dengan nilai preferensi 0.9, Aspek kedua adalah
penyusunan rencana kerja dengan baik dengan nilai preferensi 0.82, aspek ketiga
adalah pemilihan metode konstruksi yang tidak tepat dengan nilai preferensi 0.8
dan aspek keempat yang tidak kalah penting harus diperhatikan adalah aspek
pendanaan kegiatan proyek dengan nilai preferensi 0.79. Penulis
merekomendasikan kepada pengambil keputusan hendaknya memperhatikan
aspek-aspek tersebut agar waktu pelaksanaan proyek bisa dikendalikan dengan baik
sehingga tidak terjadi keterlambatan pada pelaksanaan Proyek LRT Jabodebek. =============================================================================== Jakarta Bogor Depok Light Rail Transit or abbreviated as LRT Jabodebek
is a Mass Transit system with light rail (LRT) which is planned to be built in Jakarta,
Indonesia and connecting Jakarta with surrounding cities like Bekasi and Bogor.
One of the most important problem in the construction of this Jabodebek LRT is the
delay in implementation time.
This study aims to determine the factors that have a significant influence
on the timing of the implementation on Jabodebek LRT. This research used
descriptive method. The instruments that used in data collection is through
questionnaire technique (questionnaire). This research will discuss about the
application of the TOPSIS method in classifying which factors are the most
significant to the time of construction on Jabodebek LRT. The weighting critriea
and the classification criteria using Topsis.
The results of this study indicate that land handover aspect is the first rank
to be considered as the main factor causing project delay with preference value 0.9.
The second aspect is the preparation of a good work plan with a preference value
of 0.82. The third aspect is the selection of improper construction methods with the
preference value of 0.8 and the fourth aspect which is not less important to be
considered is the funding aspect of the project activity with the preference value
0.79. The author recommends that the decision makers should consider these
aspects so that project implementation time can be well controlled so that there is
no delay to know which factor is the most significant with respect to time in the
implementation time of the project Jabodebek LRT.

Item Type: Thesis (Masters)
Additional Information: RTMT 624.215 Fah a
Uncontrolled Keywords: Waktu Pelaksanaan; Light Rail Transit (LRT)Jabodebek dan TOPSIS; Implementation Time
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: 61101-Magister Management Technology
Depositing User: Fahmi Faisal
Date Deposited: 10 Jan 2018 03:58
Last Modified: 05 Mar 2019 03:03
URI: http://repository.its.ac.id/id/eprint/48631

Actions (login required)

View Item View Item